In this video I'll share how you can use the FMEA (Failure Modes and Effects Analysis) to fix problems before they happen.
Kaizen Blueprint: www.learnkaizen.com
CONNECT WITH ME
Instagram: / dc_burroughs
LinkedIn: / chadburro. .
email me:: chad@learnkaizen.com
_______

Пікірлер: 11

  • @VinDe1216
    @VinDe121611 ай бұрын

    First Like 😊

  • @learnkaizen

    @learnkaizen

    11 ай бұрын

    and so much appreciated!

  • @donedilated
    @donedilated11 ай бұрын

    Appreciated, what I would love to see is a true life example from an manufacturing environment

  • @abhinavpachpute355
    @abhinavpachpute3559 ай бұрын

    Thank you for your awesome content!

  • @ausgod_
    @ausgod_11 ай бұрын

    This video dropped at the right time was thinking of doing one at work

  • @learnkaizen

    @learnkaizen

    11 ай бұрын

    Awesome! Sometimes the stars just align. Be sure to ask questions here in the comment section if you have questions as you get into it.

  • @snobgoblinDK
    @snobgoblinDK11 ай бұрын

    Very similar to a risk analysis from project work

  • @Abhisheksingh-rw2rg
    @Abhisheksingh-rw2rg11 ай бұрын

    Sir, Thanks for sharing . There are different type method/tools of RCA. Pls share a video on them, their limitations, benifits & specific uses. Currently I am using Why-2 analysis & fish bone diagram ( 4M) which is not enough for all types of problems. I had heard about FMEA, Now i got it 😊

  • @learnkaizen

    @learnkaizen

    11 ай бұрын

    Thank you for the video suggestion. I will add it to the line-up of videos I have planned for the remainder of the year. You are correct in stating there are multiple methods of RCA…I’ve personally used 8D, 5P, 7-Step, PSP, Kepner Tregoe and all the various tools that go along with those methods. I’ll put a video together to quickly run through the list + the difference between solving problems at the bowler level versus the tactical level.

  • @hambogumble4123
    @hambogumble412311 ай бұрын

    Considering that historical nugget and current zeitgeist, perhaps FMEA *may*have been utilised by the Manhattan project…

  • @learnkaizen

    @learnkaizen

    11 ай бұрын

    Maybe…I’d hate to be the one leading that FMEA…too many possible failure modes…one almost happened on the second trip (I believe it was the 2nd) where the bomb light activated meaning that it was armed. They quickly shut it down though…then there was the weather that forced the Nagasaki hit but the original target was Kokura (I believe)…none the less, I’d hate to be the one leading it due to the devastation more so than the failure modes. Appreciate the comment.