Pt.Willunga Esplanade Sarah Homes Video 3

This video sees the uppers floor frame completed upper wall frame braced
with the Truss Roof stood up with the required Bracing and Tie Downs.
Floor and Decking installed
Lower windows installed and cladding installed, upper windows installed
with DPC Plastic places on the sides of each window and door install.
To facilitate this a cyclone Scaffold has been installed for safety of all workers on site.
Warning this recording was taken with 20-30km onshore winds or more
which is why is bracing and tiedowns are required.