Local 34 Pile Drivers - Concrete Piles

Ойын-сауық

Local 34 Pile Drivers
80' Concrete Piling
Fixed Leads
Diesel Hammer
San Leandro California

Пікірлер: 202

  • @marsh2202
    @marsh22024 жыл бұрын

    Used to live around a construction site and watched them drive piles every so often, was one of my favourite things to watch, thank you for the video!

  • @ndn269
    @ndn2693 жыл бұрын

    Happened across this, interesting rig. My late dad did this for 45 years then I followed him into it for 10 years. Former member of Operating Engineers local 901 Winnipeg, Canada. Thanks for bringing back some memories

  • @stephenroberts4895
    @stephenroberts48954 жыл бұрын

    Big and dangerous machinery, loud environment, wild working heights, exhaust fumes from engines and the pile driver, numerous ways to get injured (hopefully not), crazy humor amongst co-workers... LOVE IT!! BIG RESPECT TO PILE DRIVERS!!!

  • @stephenroberts4895

    @stephenroberts4895

    4 жыл бұрын

    LOL!!😂😂😂. Close. Actually I’m an transportation economist who admires big machinery and appreciates hard work and the people who do this kind of work.

  • @mikenormandy9250

    @mikenormandy9250

    4 жыл бұрын

    @Nicole M Tell 'em how you really feel! LMAO! Pretty sure it takes AT LEAST 2 scabs - since you need one to rig up the pile and another to operate the machinery, no?

  • @ozsimmer6429

    @ozsimmer6429

    4 жыл бұрын

    @Nicole M Is there something wrong with being gay?

  • @pixelbender896

    @pixelbender896

    4 жыл бұрын

    Everyone always talks about how this job is hard. Lmao the fukn machine is doing all the work

  • @LucidCityBeats

    @LucidCityBeats

    4 жыл бұрын

    @Nicole M LOL you must not of seen the top of the pile break off at 13:50 and almost break the pile butt's arm. The latch rope magically pushes a so called button in that friction rig? Look i get that civil construction attracts numerous amounts of roughnecks, degenerates, and former inmates but what does that have to do with being in the union or not? A union job only means you do what your job description is and nothing more. As a bridge carpenter in the south I will vouch that we do work harder in the sense of having 50 different job descriptions for the 1 "carpenter" role and being a pile butt is included. I wish I had a crew of 6 guys that has stuck together over the years and cuts up like this with each other, instead I see guys come and go all the time because most people are to sensitive to cut up like this. The guys that work on crews like this spend more time at work then they do with their own families and has always resulted in them seeming "queer" to the outside world. People in the south have always hated on union journeymen and i find it comical. Also, keep in mind you don't have to work from the neck down to be considered a "hard" worker.

  • @Novak421SK
    @Novak421SK5 ай бұрын

    Pilebuck from local 196 checking in, nothing but respect and love for my brothers down in the bay!!

  • @archibaldtuttle8481
    @archibaldtuttle84814 жыл бұрын

    Around 40 odd years ago I was downtown and anyone could hear a pile driver at work as the sound reverberated - well probably across the river and then some. I had been watching workmen building houses, building roads, digging trenches, working on cars from the age of four. Naturally I was drawn west to the vicinity of the college and a couple blocks from there I spotted the pile driver banging away. I stood next to the fence with a few other Looky-Lews for the better part of an hour. Fascinating stuff and loud as hell. Eventually there was a break in the action and I had a chance to ask how hard the piling was being hit. I was told that the hammer weighed 10,000 pounds. The driver was driven by diesel and at maximum it could deliver 40,000 pounds with each blow. The clean fellow who turned out to be the engineer explained that as long as the rope connected to fuel feed on the side of the exterior cylinder was kept tight, the diesel would continue to be drawn into the combustion chamber and the blows would continue. It was a two-stroke motor that was started by lifting the Hammer/piston up to a automatic latch disconnect which was high enough above the head of the cylinder that when the hammer/piston dropped the diesel-air mixture drawn into the cylinder by the raising of the piston would detonate - driving the piling down and the piston up. In that case, in that situation, on the soil, there was no pre-drilling of a pilot bore. Several times, as I got to watch 10 or 12 pilings get hammered in, the the first and second blows were into unconsolidated soil and there was not enough rebound to draw in a sufficient charge to sustain the pile driving combustion cycle. The operator would lower the automatic latch to the top of the piston, and since the ground crew were hauling down on the control rope, as the piston reach the disconnect at the peak of the rise the hammer dropped and the banging resumed. So simple. Just really cool to watch.

  • @poida84

    @poida84

    4 жыл бұрын

    fascinating

  • @MrBen527

    @MrBen527

    4 жыл бұрын

    I've always wondered how they worked

  • @dhollm

    @dhollm

    4 жыл бұрын

    Thanks for the very clear description & anecdote! :)

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Archibald Tuttle Couldn’t of said it better myself.. 👏 It’s like a piston in the engine of your vehicle.. Just on a bigger scale .. the “kill rope” reroutes the fuel in the fuel pump so it doesn’t spay diesel into the barrel.. therefore killing the hammer.. The operator lowers the trip with the hammer as the pile drives..

  • @KarinasRoblox
    @KarinasRoblox4 жыл бұрын

    Imagine going to that job with a hangover

  • @user-cl7rv5cw8g

    @user-cl7rv5cw8g

    4 жыл бұрын

    All the time

  • @misfittradesman3007

    @misfittradesman3007

    4 жыл бұрын

    Steel piles are worse. Get three or four rigs running on a site and the ringing becomes endless.

  • @Shegofan78

    @Shegofan78

    4 жыл бұрын

    🤣🤣this is what we do lmao

  • @isaacbarrett9212

    @isaacbarrett9212

    3 жыл бұрын

    Did it for years.

  • @jayf8716

    @jayf8716

    2 жыл бұрын

    All the time 🤣

  • @anthonydangelo3929
    @anthonydangelo39292 жыл бұрын

    I started my apprenticeship in Boston pile driving 2 weeks ago and have driven 14 piles at my first job (4 days long) and now 36/140 in 5 days at my second job. All H piles. I'm with the same company still and learning allot but mostly from watching and occasionally the foreman will explain something to me but it's tough to hear 😂 Tough to figure things out at first but starting to get into the groove of things this is a cool video

  • @Look_Upon_The_Heart

    @Look_Upon_The_Heart

    Жыл бұрын

    I will start in a couple months, any tips at all?

  • @civilizeddelinquent563
    @civilizeddelinquent5634 жыл бұрын

    I had a real bad hangover this morning and had to pause the video and come back to watch it later in the day hahaha!!!

  • @buynsell365
    @buynsell3654 жыл бұрын

    Excellent job guys !!!

  • @b_rad5678
    @b_rad56784 жыл бұрын

    Here in Kentucky seems bridge designers are using a lot more concrete pile instead of steel H. They do tighten up faster and require less pile in the ground. Great video!

  • @not1but2and37
    @not1but2and374 жыл бұрын

    Wow! That's just amazing.

  • @lvfdchief
    @lvfdchief4 жыл бұрын

    First job out of college was with an engineering company over Raymond International drive 15,000 80 ft step taper piling on a power house job in Louisana. Raymond was a very professional company great workers

  • @alexa.davronov1537

    @alexa.davronov1537

    4 жыл бұрын

    "Was" lol.

  • @johncarreon8040
    @johncarreon80404 жыл бұрын

    Love what you do, it seems to be interesting 👍

  • @baumanagement404
    @baumanagement4043 жыл бұрын

    Very successful documentary, excellent work

  • @michaelmcquade9110
    @michaelmcquade91105 жыл бұрын

    What's up Sod-Buster I miss you brother good to see you're still running crane...

  • @Rickimusic
    @Rickimusic4 жыл бұрын

    Awesome. Local 420 checking in..

  • @genecoppedge5972
    @genecoppedge59724 жыл бұрын

    I was amazed how fast your crew can drive a piling into the ground, good job. You all make it look easy but I’m sure it’s not.

  • @austin2466

    @austin2466

    4 жыл бұрын

    The ground there is soft and wet. Rarely goes that fast. Also. Im not a pilebutt so what do i know

  • @keithjohnson281

    @keithjohnson281

    3 жыл бұрын

    @@austin2466 uh in uh

  • @user-ub1vt4oj2p
    @user-ub1vt4oj2p4 жыл бұрын

    Great job guys

  • @michaelmcquade9110
    @michaelmcquade91105 жыл бұрын

    I hope you guys know that your crane operator he is one of the best around keep up the good work Sod-Buster

  • @piledaddytv

    @piledaddytv

    5 жыл бұрын

    Well aware brother.. That's my boy!

  • @isaacbarrett9212

    @isaacbarrett9212

    3 жыл бұрын

    Sod is definitely one of the best.

  • @pjneslo8979
    @pjneslo89794 жыл бұрын

    Old diesel hammer that spits glob of grease everywhere.. Retired local 56 Boston, Mass!

  • @23phaynes

    @23phaynes

    4 жыл бұрын

    Who did you work for?

  • @pjneslo8979

    @pjneslo8979

    4 жыл бұрын

    @@23phaynes Donaldson, Then Hayward Bakker, Cashman, Testa. Aetna Bridge etc

  • @pjneslo8979

    @pjneslo8979

    4 жыл бұрын

    @@23phaynes Any reason why you asked? You a dock builder as well?

  • @mrdeplorable953
    @mrdeplorable9534 жыл бұрын

    Keeps in tune

  • @jojobenchpress6965
    @jojobenchpress69652 жыл бұрын

    Our piledrivers here in michigan are with the carpentry union, starting my pre apprenticeship soon excited to get in the trade 💪

  • @jermaineporter1101
    @jermaineporter11014 жыл бұрын

    awesome work. work for kiewit and we got 4 driving rigs and our subcontractor got 3 and we giving 90" long piles.

  • @Crewsy

    @Crewsy

    4 жыл бұрын

    Jermaine Porter Wow. 90 inch piles. So you mean fence posts. 🤣😂🤣😂 Yes. I know you mean 90 foot but that’s 90’ not 90”.

  • @jermaineporter1101

    @jermaineporter1101

    4 жыл бұрын

    Wayne Crews apologies lol I didn’t proof read when I was writing this but yea . We doing 90’ concrete poles and 120’ pipe piles

  • @onestepatatime2346

    @onestepatatime2346

    4 жыл бұрын

    @@jermaineporter1101 Hey Jermaine, hats off to the boys at Kiewit, watched them build the oroville dam spillways rebuild. Men of steel!! they were working 24-7

  • @jermaineporter1101

    @jermaineporter1101

    4 жыл бұрын

    Larry Bonato tell me about it lol I’m on the LNG job in Louisiana and that’s what we’re doing

  • @williambryant5946
    @williambryant59464 жыл бұрын

    Looks like you doing all the work and the other guys are standing around.

  • @jimc12

    @jimc12

    4 жыл бұрын

    That's called an journeyman lol

  • @UnwrappingByMimiKoteng
    @UnwrappingByMimiKoteng4 жыл бұрын

    Amazing

  • @kule510
    @kule5104 жыл бұрын

    Good video

  • @sonoffar8956
    @sonoffar89564 жыл бұрын

    Thanks guys.

  • @MEEEEEEEE903
    @MEEEEEEEE9034 жыл бұрын

    Just kidding man I love seeing any footage of any driving and I've watched a few of your vids and you seem legit seem like a good group of guys do I just prefer the water work myself

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    maxx luebeck To each their own brother

  • @cocacola50
    @cocacola504 жыл бұрын

    We will we will we will rock you !!!

  • @billsparks5236
    @billsparks52364 жыл бұрын

    Please, please, please tell me you all are wearing hearing protection! I was a pile driver operator back before protection was mandatory and I suffer now from hearing loss!! You guys look like you’re doin a good job, though. Sure miss those days.

  • @archibaldtuttle8481

    @archibaldtuttle8481

    4 жыл бұрын

    I know what you mean. I retired from moving oil rigs - also loud as hell, great fun and well paying. I miss the work. I miss the dudes. I miss the machinery and equipment. I used to describe it as a bunch of big kids on a big dirt pile with big toy trucks and a huge erector set playing in the dirt!

  • @charlesbourgeois9029

    @charlesbourgeois9029

    4 жыл бұрын

    Shit I got hearing loss from Landscaping! Chainsaws, mowers, blowers, chippers, and vibratory compactors ect. I'm an idiot to not of been on my game with PPE across the board!

  • @vdpeer
    @vdpeer4 жыл бұрын

    They go to a 'refusal' point. That's some really organic looking stuff.

  • @johnnytyrrell7060
    @johnnytyrrell70604 жыл бұрын

    I'm from Dublin Ireland and I worked on a Rig for a bit did not like it so I went back to the Concrete Pumping game.🏆🏆🏆🏁🏁

  • @Fony_turgeson
    @Fony_turgeson4 жыл бұрын

    1456 here nyc

  • @Africanfrogs
    @Africanfrogs4 жыл бұрын

    Easiest job I ever had right here

  • @leeanncotrone8369
    @leeanncotrone83694 жыл бұрын

    Love this ,it's got wrythm,had one across the street junttan h26 sounded like ' ikka boom ikka boom ,boom boom boom boom continues haha everyday at 7 am that was my alarm clock 😀

  • @keithjohnson281

    @keithjohnson281

    3 жыл бұрын

    That sounds like money to me

  • @chrisw6734
    @chrisw67344 жыл бұрын

    Not going to lie. There is much worse then being above ground watching a machine drive piles in all day.

  • @keithjohnson281

    @keithjohnson281

    3 жыл бұрын

    Only if you are am inspector that has to count each blow

  • @jerryhubbard4461
    @jerryhubbard44614 жыл бұрын

    I was in the local 35 pile drivers and we kicked ass.

  • @rodneyball6017
    @rodneyball60175 ай бұрын

    Have you guys ever driven 36 inch square 170 foot concrete pile from a brage with swinging leads just saying come out to bridge construction in florida.

  • @cdouglas1942
    @cdouglas19424 жыл бұрын

    A little context would have added value for those of us not in the industry, but interested.

  • @roxborotomm

    @roxborotomm

    4 жыл бұрын

    The piles/piling are pounded into unstable ground usually to bedrock. They will sometimes place hundreds of these for a foundation of a building (or bridge, etc), which this looks like what they are working on here. If you poured a concrete foundation for a building in bad soil without piles, you would have major issues once the building went up. The weight of the building would settle and could cause failure. These piles stabilize the structure.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    cdouglas1942 I thought about that too thanks for the feedback

  • @iFulixzer

    @iFulixzer

    4 жыл бұрын

    The building would sink and settle in the ground, not much but it would make it crooked and make doors hard to open and many other issues.

  • @roxborotomm

    @roxborotomm

    4 жыл бұрын

    @@iFulixzer Our local HS gym settled so much it pulled slightly away from the main building. The tore it down and rebuilt it a few years ago. I'm not sure if piles would have been the issue, more likely the ground was not compacted enough before construction.

  • @cdouglas1942

    @cdouglas1942

    3 жыл бұрын

    @g bonita Yes. The idea with piles is that they have to support a load. If they stop moving they've likely hit bedrock...far enough.

  • @evankoutchak51
    @evankoutchak514 жыл бұрын

    Pile driving asmr

  • @isaacbarrett9212
    @isaacbarrett92125 жыл бұрын

    Out Fucking Standing!!!!! Couldn't have done it better myself!

  • @barefootski
    @barefootski4 жыл бұрын

    Impressive. What is the reason for the rope that you keep winding and unwinding?

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    barefootski one rope is for the trip (that grabs the piston) one rope to kill the hammer (reroutes the fuel)

  • @barefootski

    @barefootski

    4 жыл бұрын

    @@piledaddytv Thanks of getting back to me. Yes, that all makes sense.

  • @theotherfinnegan9955
    @theotherfinnegan99554 жыл бұрын

    nice rig. I used to drive wood never seen concrete. #1 hammer?

  • @chiefaves
    @chiefaves4 жыл бұрын

    Sweet vidja man, she hitting bedrock? What are you guys workin in, hard pan or hard clay? Lookin at a map, I doubt the ground freezes that far south 😂 but it takes a few whacks to drive a locating spike.

  • @marcuswhonea
    @marcuswhonea4 жыл бұрын

    Nice grease gun work. Timing was on point. What a muck fuck day to slam.

  • @jimc12
    @jimc124 жыл бұрын

    Real life demonstration of what a migraine or tooth ache is like.

  • @keithjohnson281

    @keithjohnson281

    3 жыл бұрын

    haha that's funny

  • @bozoone4464
    @bozoone44644 жыл бұрын

    Sweet

  • @Space__Otter_
    @Space__Otter_5 жыл бұрын

    You ever do any augercast or do you just to driven piles?

  • @piledaddytv

    @piledaddytv

    5 жыл бұрын

    Justin Coe I do it all Bay bee! 💯

  • @publicprofile1
    @publicprofile14 жыл бұрын

    This might be the location on google maps: 37°42'39.2"N 122°11'42.4"W

  • @hvguy
    @hvguy4 жыл бұрын

    Grease it! Ok, no, now, while it's on. Go. 🤣

  • @shiddiq26
    @shiddiq264 жыл бұрын

    How calendering they got each pile ?

  • @oscarguner1704
    @oscarguner17044 жыл бұрын

    Haha very nice so many on the ground🤣🤣🤣 maybe get a new crane aswell🤣🤣

  • @cblackwell83
    @cblackwell834 жыл бұрын

    as a pile driver myself there is a bunch of safety stuff not happening like being 20 + ft away from hammer and while hammer is working you dont get on it

  • @TheNemosdaddy

    @TheNemosdaddy

    4 жыл бұрын

    Rules are written in blood and you're one of the issues. Yeah "common sense" isn't so common anymore.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    🤣

  • @rossijohn1408
    @rossijohn14083 жыл бұрын

    I didn't know they pre augered holes before actual piling.

  • @andrewrees8749
    @andrewrees87494 жыл бұрын

    I've only seen this once,with much shorter piles, why dont the concrete pile just shatter under the impact of the driver head ?

  • @xX1GuNNy1Xx

    @xX1GuNNy1Xx

    4 жыл бұрын

    around the 8 minute mark appears they put a wooden? block inbetween where the ram and the pile would be. would imagine this takes the most aggressive shock out of it to a level that's not going to damage the piles.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Yea we use cousin blocks.. Yet you can still beak the the pile if the hammer is not plumb with the pile

  • @twitch01
    @twitch012 жыл бұрын

    What's the most physically demanding part of the job?

  • @BeezyKing99
    @BeezyKing994 жыл бұрын

    Love the sound of these pile drivers... always want to see one, but unfortunately it’s concrete cast piles that get put in the ground.... so no drivers like these up here in Canada as far as I know.... at least in Ontario.

  • @Crewsy

    @Crewsy

    4 жыл бұрын

    Beezy King I’ve never seen concrete piles here in Ontario. Only reason I watched the video was because it was concrete piles. I would never have thought concrete could stand up to the pounding without failing. I learned something without trying today.

  • @ArthurDentZaphodBeeb
    @ArthurDentZaphodBeeb4 жыл бұрын

    Brings back memories of Foundation crews back in the day. Doesn't seem like much has changed - lots of angries and shit def flowed downhill fast. But great video - shows just how it is to be a pile butt. Never understood why anyone wanted the job. Doesn't pay much more than other trades.

  • @CoCojoy420
    @CoCojoy4203 жыл бұрын

    Dayumn Gina, wonder if they use that device making that noise at Gitmo

  • @davem3789
    @davem37894 жыл бұрын

    Those probably aren’t made from bags of Quikrete.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    😂

  • @davidanalyst671

    @davidanalyst671

    3 жыл бұрын

    i don't have experience, but I'm betting they have some serious steel in there

  • @leoslandscape24
    @leoslandscape244 жыл бұрын

    What's the purpose of those?

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Leo's Landscape & Lawn Stabilizes tall buildings and bridges to the foundation

  • @manfredvonrichthofen4738
    @manfredvonrichthofen47384 жыл бұрын

    i drove pile at olympic stadium in "95 with local 225

  • @charlesrobey796
    @charlesrobey7964 жыл бұрын

    Question why do they put these in the ground and how many can they do in a 8 hour shift.

  • @dustinthewind3925

    @dustinthewind3925

    3 жыл бұрын

    1- foundations...they keep heavy structures/buildings from sinking into the ground. 2- it varies, mostly depending on type of piling, length, and soil conditions.

  • @daltonrumbarger2701
    @daltonrumbarger27014 жыл бұрын

    That an old cat front loader in the beginning of the video?

  • @cowboyup6744
    @cowboyup67444 жыл бұрын

    I wanna be a pile driver when i finish school because it pays well in Australia. Do you think its good work to get into straight after school?

  • @cooldude2245
    @cooldude22454 жыл бұрын

    You guys don’t get paid enough. Dangerous work

  • @franciscomontoya383
    @franciscomontoya3834 жыл бұрын

    porque se hace pilotaje

  • @philthyco1
    @philthyco13 жыл бұрын

    You should monetize and get paid!

  • @volkerhermey4714
    @volkerhermey47144 жыл бұрын

    Über veraltet Baumaschinen?

  • @MAHOOCH626
    @MAHOOCH6264 жыл бұрын

    is the power driver powered by hydraulic oil diesel power

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Diesel

  • @eoqueacasaoferece
    @eoqueacasaoferece4 жыл бұрын

    a lot of experts here, just shut up and let the man work.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Jeff gordon Realest shit I’ve heard 💯

  • @TheNimshew
    @TheNimshew5 жыл бұрын

    Somebody is looking out for y'all. You get a paid holiday for Boxing day! Lol

  • @piledaddytv

    @piledaddytv

    5 жыл бұрын

    forty two wtf that supposed to mean?? Get off my comments weirdo

  • @TheNimshew

    @TheNimshew

    5 жыл бұрын

    @@piledaddytv It means, dumb ass, that the day after Christmas is a paid holiday. And, gladly

  • @Crewsy

    @Crewsy

    4 жыл бұрын

    forty two Boxing Day is a Canadian holiday not an American holiday. The 26th is just another work day for many in the USA.

  • @25mfd
    @25mfd4 жыл бұрын

    why not use a vibratory hammer?

  • @shopshop-lx9hj
    @shopshop-lx9hj4 жыл бұрын

    two guys (plus the operator) working, two guys basically watching! So it goes------

  • @leeanncotrone8369
    @leeanncotrone83694 жыл бұрын

    The house shook

  • @analstench4522
    @analstench45224 жыл бұрын

    BIG UNION MOOD TEAMSTERS LOCAL 705

  • @franciscovillar2264
    @franciscovillar22644 жыл бұрын

    Hello Kid, What section and length are these piles? and how much do they do per day?

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Francisco Villar 80’ piles bout $50/hr

  • @robertduncan2742
    @robertduncan27424 жыл бұрын

    Has there been a time when driving that there's been something very hard that couldn't be gone through

  • @13eckerlosmuerte

    @13eckerlosmuerte

    4 жыл бұрын

    Calichi is a bitch, it's pretty much concrete for dirt. Takes a 45min job to 3 hours plus of hell

  • @connorcranes

    @connorcranes

    4 жыл бұрын

    All the god damn time, normally we reach a refusal criteria then refer back to designers and say this is solid, do you want to persevere or shorten the pile. Perseverance can mean drilling around the pile or a bigger hammer 👍🏻

  • @mark77193

    @mark77193

    4 жыл бұрын

    I have seen wooden piles getting driven a few times over the years(I'm in the roofing trade). One of those was soft sandy soil near a river, there was 2 piles that would not drive past halfway. They would just bounce back up. The contractor said it was probably a tree trunk that got buried by the river sediment. They were going to have to drill through it & drive an extra pile alongside the ones that couldn't be driven all the way. The same area also has deep gullies, parts of which have been filled in with soil & debris from roading & construction projects. When someone wants to build on one of these areas, it can be a real pain for the piling co. when the fill included concrete slabs, old road kerb sections etc.

  • @philthyco1
    @philthyco15 жыл бұрын

    Y'all the ones that cause the earthquakes!! Lol

  • @user-fl3yi5rq8b
    @user-fl3yi5rq8b4 жыл бұрын

    Why they wear sunglasses when its total cloudy?

  • @Crewsy

    @Crewsy

    4 жыл бұрын

    P Because when you’re as cool 😎 as they are the sun ☀️ shines on them 24 hours a day. Or they’re totally effed up on drugs and trying to hide their eyes. You pick.

  • @CAT972

    @CAT972

    4 жыл бұрын

    I wear sunglasses before the sun completely come up and after it goes down 😎

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    P gotta have eye protection

  • @stacy3633
    @stacy36334 жыл бұрын

    Good honest work...but pretty boring work...I would find me something else just a little more interesting And a little more challenging

  • @antoniofranco77
    @antoniofranco775 жыл бұрын

    I have an interview to get into the pile driving union. any advice on what i should expect for the interview?

  • @piledaddytv

    @piledaddytv

    5 жыл бұрын

    francisco franco couldn’t tell you bro

  • @fredricful
    @fredricful4 жыл бұрын

    Aif?

  • @aearnest
    @aearnest4 жыл бұрын

    i'm now carsick

  • @niceday6354
    @niceday63545 жыл бұрын

    There must be a lot of accidents?

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Nice Day naw bro not even

  • @JoseLopez-tj6um
    @JoseLopez-tj6um4 жыл бұрын

    Ingeniería de la edad de piedra.todo afuerza .cuando acabas de ponerlo ya lo estrellas te.primero drill

  • @joepublicsafety313
    @joepublicsafety3134 жыл бұрын

    That one dude saying I expect you to listen is a real scumbag hater who thinks he's a man when in reality he's a homosexual I seen his kind even in my line of work real scumbag hater keep doing you bro they just hating

  • @TheNimshew
    @TheNimshew5 жыл бұрын

    Let me guess. The foreman's boss didn't like you going between the framework to hook the zerk fitting.

  • @piledaddytv

    @piledaddytv

    5 жыл бұрын

    forty two lemme guess.. You don’t have any idea wtf is going on....

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Matthew Fogarty I know exactly what’s going on

  • @billyproctor9714
    @billyproctor97144 жыл бұрын

    Could have been an informational video if the camera wasn't jumping around so much, Cheers, Billy in Canada

  • @lilkaz1910

    @lilkaz1910

    4 жыл бұрын

    Billy Proctor he’s wearing a go pro on his hard hat, do you think he’s using a fucking stabilizer? No he’s not dumb comment.

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Yea sorry bro I’m a pilebutt not a photographer

  • @georgelutz8212
    @georgelutz82124 жыл бұрын

    Hanging n Banging !! IF U AINT UNION YOU AINT HUMAN !! Stay safe.Carp.Lu 255.

  • @AngelLuisTrinidad
    @AngelLuisTrinidad4 жыл бұрын

    Wow, driving that in there with no Vaseline. I'm sure mother earth doesn't like it.

  • @jermaineporter1101
    @jermaineporter11014 жыл бұрын

    also , when predrilling, why not knock the dirt back into the hole

  • @jeffreylynds2340

    @jeffreylynds2340

    4 жыл бұрын

    Jermaine Porter why would you do that 😂

  • @piledaddytv

    @piledaddytv

    4 жыл бұрын

    Jermaine Porter cuz the pile has to go in it

  • @ragipcamlibel8208
    @ragipcamlibel82084 жыл бұрын

    Yeri çekmiş makina vuruşunu çekseydin

  • @TheJoker2484
    @TheJoker24845 жыл бұрын

    get some box iron make a h to suit piles instead of hugging that pile otherwise good vid

  • @bstevermer9293
    @bstevermer92934 жыл бұрын

    Does a lot of gay sex happen on the job site?

  • @peternancarrow3319
    @peternancarrow33195 жыл бұрын

    As an operator why in the fuck are you guys getting under the leads, don’t trust the equipment you will live longer

  • @ogugort9022
    @ogugort90225 жыл бұрын

    Why are you so many groundsmen? Here in sweden one drive the crane and one groundsman. Seems like waste of staff to be that many.

  • @kylea1836

    @kylea1836

    4 жыл бұрын

    Its union thats why

  • @eoqueacasaoferece

    @eoqueacasaoferece

    4 жыл бұрын

    yea good for you, if you need some help the crane operator has to stop genios

  • @oscarguner1704

    @oscarguner1704

    4 жыл бұрын

    Jeff🤣🤣 u americans have so much to learn🤣🤣

  • @JohnSmith-ip5ik

    @JohnSmith-ip5ik

    4 жыл бұрын

    Oscar Guner Or vice versa....

  • @robinrodriguez480

    @robinrodriguez480

    4 жыл бұрын

    @@oscarguner1704 - No we like to keep people working and not slaving!! If thats the case why don't you just have one guy? He jump of and on the crane ?? Grease and drive forklift and layout since you people are so eager to be a slave !! oopps i mean work??

  • @ogugort9022
    @ogugort90224 жыл бұрын

    This is really dangerous the way you work.

  • @scottknickman9828
    @scottknickman98284 жыл бұрын

    all was one who don't want to work

  • @codyloughran3696
    @codyloughran36967 ай бұрын

    Really dumb too grease the hammer while its running

Келесі