Welcome to day 4 on the 1st fix of a loft conversion we’re currently building.
On today’s episode we’re building the ashlar walls, putting the steel ridge beam in and building the dorma roof.
The Steel beam is a PFC 150 x 90.
Dorma walls are 150mm x 45mm C24 softwood timber.
The roof is made out of 195mm x 45mm C24 soft wood timber @ 400mm centres.
Hope you enjoy 😊
Пікірлер: 22
Looks really good guys and I have learnt loads ty.
Nice work mate
Timbers for the dormer lintel should not be laid flat. They should be arranged like flat roof joists.
I’m utterly fascinated with construction. Fantastic job from a bloke that wanted to be a bricklayer but ended up a jeweller/bullion dealer 😬
@jeztickles4361
Жыл бұрын
😂 I know which profession I’d choose
nice work looking good .....
@extendaspace-constructionc821
2 жыл бұрын
Thanks Lee 👍👍
That’s why I need to learn how to do this DIY on my parents house where I live. Look at all those guys on site, getting £150/200 easy. £800 a day labour easy. That’s why loft conversions cost £50,000!!! I want to do it in around £15,000.
Is that steel ridge sitting inside on the bricks on both sides because it looks as if it's just sitting on top of those stud timbers on one side?
@nb6011
Жыл бұрын
Probably sat on a load bearing post transferring weight down to a brick wall below. Is my guess from what you can see in the vid.
@lukehusbands4037
6 ай бұрын
On one of his former videos you can see him go into the cavity to lay a pad stone, it’s all tip top!
was it really too much effort to put a bit of flooring under the hop up instead of balancing it on the top of a joist. lucky this time.
Do you have complaints from neighbours 😊
how much roughly would you say this project costed the client
@extendaspace-constructionc821
7 ай бұрын
The total project was about £37k, decent room when it was finished 🤙
Was this done all in a day
@extendaspace-constructionc821
2 жыл бұрын
Yes the dorma you can see at the back and the roof was all constructed in a day, we had to get it done and closed in because the rain was due in about 6pm that eve ! 👍
@belayvisual6633
2 жыл бұрын
@@extendaspace-constructionc821 Great work guys
Terrible work timbers across window not strong enough to take roof load
@extendaspace-constructionc821
7 ай бұрын
Sorry are you building control?? Because they signed it off ok !!
@miltzrodrigues8826
6 ай бұрын
@@extendaspace-constructionc821 the above observation is structurally correct, even if building control has signed it off. Its physics.