Yardistry Greenhouse Build Day 5 Reposition Frame - Connect Sides - Fix base

Project day 5 - Putting the sides together - AFTER moving the base to allow room to slide roof panels in adjacent to the existing shed.
In today's video, we move the base north about a foot and east about 18 inches. Then re-leveling the base. Too bad I hadn't noticed the mistake in the north east corner of the base. That comes in the second half of the video!
We got the sides in and connected - fixed the base then attached the greenhouse to the base.
Please note: We found a few problems with the printed version of the guide/manual. First a "page" (meaning 4 printed pages - 38/39 and the other side of the "fold") was completely missing. Second, in the manual, the "square check" said 9'-2". But the online version of the guide said "9'-2 7/16" which is in fact exactly what the building was. We could have finished this day at least an hour sooner if that had been correct.
Well, and to be completely frank - if I had built the base correctly!
Next - we put the sides and roof on.
Thanks again to our subscribers - you help me want to do more and more videos!

Пікірлер