Werribee and Hoppers Crossing feasible designs explained

We’re getting on with removing three level crossings at Cherry and Werribee streets in Werribee, and Old Geelong Road in Hoppers Crossing with construction set to begin in 2020. There are two feasible designs for the level crossing removal at each location. Based on technical considerations and achieving positive long-term outcomes, a preferred design has been identified for each site.

Пікірлер