Joel doesn’t buy suits and ties, gizmos and gadgets, or toys and trinkets; he just wants power. Electrical power, that is. With 8 kids approaching (electric) driving age, big cooking and cleaning appliances, a pool out back, and a carriage house over the garage, there is a big need for big power.
While 1,000 amps should reliably get the job done for many years to come, there is a smarter (and cheaper) solution. Generally home electrical services are calculated according to the maximum draw, but if the panel could keep track of which loads were on and off, less power would be required. SPAN is our current preferred smart electrical panel for this very reason. Follow our channel for more installations and demonstrations of how SPAN can make your house genius.
Laced within the technical instruction are recommendations and points of professionalism employed daily by Jefferson Electric masters, journeymen, & apprentices.
If the instruction in this video is unclear or skew to what you are searching for, feel free to comment below for additional assistance.
EPRO-2-Call:
You’ve got the tools and the willingness to solve your own electrical problem, but are held up by a couple ominous details. Rather than hiring out the whole project, get EPro’s own Joel Walsman on a video or voice call here: electric-pro-academy.square.s...
Products We’d Recommend:
*EPRO endorses pro-level tools & materials, and receives a small commission for purchases through our links from Amazon & other affiliate programs. We’d be happy to recommend more cost-effective products for DIYers and low-frequency users if you engage with us in the comment section!
[] EPRO’s Amazon Storefront: smile.amazon.com/shop/electri...
National Electrical Code (NEC) referenced in our videos:
Free Access Here: link.nfpa.org/free-access/pub...
Outline:
0:00 - Introduction
1:21 - Analyzing Current Equipment
6:03 - Prepping For Disconnection
11:05 - Utility Disconnection & Chatting With The Linemen
13:05 - Meter Base Prep
18:17 - Previous Meter Base Removal
21:52 - Further Meter Base Prep & Layout
28:04 - Old Accessory Equipment Removal
32:11 - EV Meter & Trailer Panel Progress
34:55 - Mounting Meter Base #2
44:36 - Another Trailer Panel?
45:53 - Energizing Meter Base #1 & Prepping For Meter Base #3
48:36 - Connecting Meter Base #2 To Interior Carriage House Panel
51:08 - Brick Wall War For Meter Base #3
53:44 - Back to Carriage House Panel Connection
54:13 - Terminated Carriage House Panel in Meter Base #2
56:09 - Back to Meter Base #3…
59:41 - Expansion Fittings
1:01:53 - Carriage House Goes Live!
1:02:24 - Joel Goes Solo
Connect With Us:
Electric Pro Academy is a multimedia team dedicated to training and instructing DIYers and professional electricians for the growth and dignity of the craft nationwide.
/ electricproacademy
/ electricproacademy
odysee.com/@ElectricPro
Jefferson Electric installs and services residential, commercial, solar, and Tesla systems in Indianapolis, IN.
www.jeffersonelectricllc.com/
/ jeffersonelectric
/ jefferson-electric-llc
Got a question or ideas for a future video? Leave a comment below and submit your idea here: forms.clickup.com/f/23xa9-70/...
Thank you for watching; we value your feedback and monitor this channel daily.

Пікірлер: 396

  • @speednutsII
    @speednutsII Жыл бұрын

    Joel, I’m a homeowner but over the last 4 years being a stay at home dad and working part time (I’m a pharmacist by trade) I’ve had some Time to go from only having connected a dishwasher to upgrading my own service from 100 amp to 200 amp and wiring my kitchen addition (yes I torqued my connections with the tighten loosen tighten wiggle tighten torque method). I’ve worked in live panels now, done stuff I’ve never thought I was capable of. Lineman that disconnected my house were awesome, the inspector has been awesome and helpful as well. I would have certainly been an electrician had I gone into the trades. Just an awesome career. Anyway, I know the feeling you had at the end of this video walking around the house with my 4 young kids all excited about the upgraded service. The amps somehow just feel different and new haha. Of course your 1000 amp service is way beyond my capability or experience but now to have more panel space, safer connections, etc) just feels awesome. Anyway, I love your videos. I’ve been watching them early in the morning while rocking my 1 month old. Awesome content. Keep it coming! It feels like I’m right there on the job site learning from you with these videos.

  • @Silky_boi
    @Silky_boi Жыл бұрын

    I pulled a big project at my home too, I work in HVAC and replaced my AC system with new copper lineset and high and low voltage, and Reducted the whole house while adding some extra return ducts. I ended up finishing at 2 in the morning and had to go to work at 6. We’re insane but we love the challenge!

  • @mathman0101
    @mathman0101 Жыл бұрын

    Those linemen were exceptional years of experience polite and very helpful. When everyone is pushing in the same direction makes a difficult job easier. We have a work cut-off at sundown in Northern Virginia especially in HOA areas. Bricklaying should be another skill to perfect at Jefferson electric😂

  • @jkxss

    @jkxss

    Жыл бұрын

    What electric company do you work for in Northern VA?

  • @leotexas3485
    @leotexas3485 Жыл бұрын

    I haven’t yet had a chance to partake in upgrading a service. You were on a time crunch, but yet still managed to document a video of this. Great learning video, and thank you for posting!

  • @TheModelmaker123
    @TheModelmaker123 Жыл бұрын

    I loved this video. Fraught with the challenges that happen on real jobs. You never have enough tools, parts and supplies but power through with what you have, solving one problem after another, fighting issues, continually adjusting as necessary until the end. Great positive attitude throughout, and the narration to let us know what you're thinking at each step.

  • @richardprice5978

    @richardprice5978

    Жыл бұрын

    grinding out the morder and vibrating the bricks is faster FWI, 400A house 🏡mod here millwright aka not a mason guy but was paying attention to the people that i hired 👍 multi tool works wonders for plunge grinds 😉

  • @andrewanderson2176
    @andrewanderson217614 күн бұрын

    I’m a 25 year electrician in Vermont and glad I ran across your channel I appreciate seeing a fellow surly doing a quality job

  • @tvbrauer1566
    @tvbrauer1566 Жыл бұрын

    For the tape issue, one of my foreman showed me to wrap the pipe with a layer or two sticky side out first. Then tape over the top sticky side down. This creates a cap if you will that you can fairly easily remove without all the residue and sticky.

  • @jamesgarrison6430

    @jamesgarrison6430

    Жыл бұрын

    Yup. Or use color tape it doesn't leave the sticky residue

  • @throttlebottle5906

    @throttlebottle5906

    Жыл бұрын

    if it's just temporary and standard inch plumbing size pvc/steel, then just grab rubber pipe cap from the plumbing department! since there's no electrical in there it would be fine and they're reusable. they have a large hose clamp to tighten in place (nut driver/flat head).

  • @Eddy63
    @Eddy63 Жыл бұрын

    What a fun little video to watch ... All those guy's did a great job ... Thx for posting ...

  • @caidhg
    @caidhg Жыл бұрын

    Conduit is always better than direct bury, there are a lot of places getting fiber to the home now and having an upgradeable path is always best also a 2 in conduit would be better if you will have multiple companies in there.

  • @Gruntled2001
    @Gruntled2001 Жыл бұрын

    Joel, thank you for sharing your knowledge, but also thank you for taking your time to edit the video and to put it up for us! 💌

  • @stargazer2504
    @stargazer2504 Жыл бұрын

    1000A? Tell us you're building an indoor grow without telling us....

  • @phenry5083

    @phenry5083

    3 ай бұрын

    Tell us you didn't watch the video without telling us....

  • @JerryMcCray-d1k

    @JerryMcCray-d1k

    12 сағат бұрын

    Ya, all the kids, all the EVs, high power equip; hell nah 1000A. He gonna have HID lights, pumps & regulators too lol.

  • @thedanyesful
    @thedanyesful Жыл бұрын

    This is the first time I've watched your video and wow. Your perspective and the way you show each step and communicate clearly is really engaging. The subject matter is super interesting too.

  • @william-ericgomes2056
    @william-ericgomes205610 ай бұрын

    Your son is getting such a great amount of education helping you out. That’s so awesome

  • @ronlovell5374
    @ronlovell5374 Жыл бұрын

    Wow 400 amp for EV ? That's quite an electric fleet. Nice job with very impressive problem solving, attention to detail, and pure will and determination to finish. Also was awsome that your family helped you out late into the night. Overall a great video, Thanks for sharing!

  • @richardprice5978

    @richardprice5978

    Жыл бұрын

    i figured full-copper simens 400A's @ 240V was going to take me awhile to fully be needing 800A's ( as 600A when i asked isn't a thing around my area's, so if i out grow the box's id need 2x and 3p 208 or 480V isn't a option i tried and i really wanted it ) aka 200A for the house and 100A BEV charger's 2x and solar 20KW starting point was a 1970 challenger 100A aluminium and yes it did try and burn the 1970 limestone/bricked 3000sf house down with it in 2017-2020 as i took awhile for trenching/permit's ect and of course getting the funds to pay for it family/boomer old man teased me about it and asked me if i was trying to run apartments or manufacturing off it, nope just home's use more electric power than even in the 90's/2000's did 200A main SCR is minimum's size for my consideration for a single family residential homes 🏡and 400A is the big guns nowadays and 100A isn't enough 🔥hazard

  • @victorsaavedra5007
    @victorsaavedra5007 Жыл бұрын

    Bro burnt the shit outta that conduent smh 😂

  • @Karma-fp7ho
    @Karma-fp7ho Жыл бұрын

    thanks for showing all the steps. The kids were awesome.

  • @vince6829
    @vince6829 Жыл бұрын

    Wow!! That’s a big job. Thanks for sharing.

  • @Kangenpower7
    @Kangenpower7 Жыл бұрын

    I was watching you install some ground rods in another video, with a rotary hammer drill, and that works great! Another way, or if you are installing the metal fence posts, is to use a 2" trailer hitch receiver. I used a 18" long hitch extension, that weight is about 15 pounds, and the fence posts went right in. Just slide it over the item being driven into the ground, and lift and bang it in.

  • @casetoburrito
    @casetoburrito Жыл бұрын

    Nice approach to your SPAN sponsor at the end. It got me excited about a product for once!

  • @philsmock4943
    @philsmock4943 Жыл бұрын

    Great video. Watched it all. Good job. Thanks for sharing.

  • @gregchambers6100
    @gregchambers6100 Жыл бұрын

    "Yew sparkies don't wurk haard! All yew dew is put little wars together!!" Very nice work guys. Good solid team.

  • @jovetj
    @jovetj Жыл бұрын

    That offset Sch 80 looks terrible. 😞 It's a shame that second bend straightened back out.

  • @BluCappy419

    @BluCappy419

    Жыл бұрын

    Needs a Greenlee hot box and a little generator will bend much cleaner bends, and won't get so many burn marks.

  • @ilike1sand0s68

    @ilike1sand0s68

    Жыл бұрын

    @@BluCappy419 . ()((()/٪%%%"%))

  • @rrussell39

    @rrussell39

    Жыл бұрын

    Yep...that bugged me and I can't even see it from my house. I have bent PVC with a torch before, but always taped both ends to hold the heat and heat it up quicker and more evenly.

  • @galaxybounce82

    @galaxybounce82

    Жыл бұрын

    Most utilities don't allow you to bend the pvc because you can warp the inside diameter and when you pull a mandrel through you'll fail the test and have to dig it all back up again.

  • @moosepasshippie

    @moosepasshippie

    Жыл бұрын

    There is absolutely no way I would let that fly sitting on the outside wall of my electrical business or house. In the ditch it would be OK.

  • @erikowren7894
    @erikowren7894 Жыл бұрын

    The best quality time spent with a dad and son is learning/helping with projects. God Bess. These are the memories our sons will carry with them and make them into great men.

  • @cr1m203
    @cr1m203 Жыл бұрын

    Although I could never afford all the beautiful things in just one video and the great work I know one thing if I didn’t own my place I would definitely rent from this man. I wouldn’t mind having all that gear on the side of home if it all serves a purpose. I rather be safe than sorry. Great work man.

  • @billm6171
    @billm6171 Жыл бұрын

    Southwest Missouri here, really nice video it was a lot of work

  • @christopher20008
    @christopher20008 Жыл бұрын

    Great job ,love videos like this.

  • @pianoman4Jesus
    @pianoman4Jesus Жыл бұрын

    Joel, 20 years ago, I trenched a 2" PVC for communicators out from the front of our house to a covered underground electrical box just inside the front easement. "Our 2 inch beats your 1 inch... cool!" We expect to get Fiber Internet pulled through that in the near future. That is exactly why I wanted to trench a conduit for the communications line. I trenched a 3" also out to the front easement that the utility then pulled their underground cable through at a discounted rate per foot as we had trenched the conduit for them.

  • @pianoman4Jesus

    @pianoman4Jesus

    Жыл бұрын

    P.S. Joel.... When the first Gulf War broke out, I made a career decision to pursue IT rather than the electrical sector. Back then I was seeing journeyman sparkies begging for work. However that does not mean I must void all of my knowledge and experience. I run my residential electrical in EMT. I bend EMT for therapy! 🙂 Also I am a grounding snob. That new electrical service we put in 20 years ago.... We have a house built in the late 1920's. We added on a single large single story addition on the back of it. I located the new electrical service on the new addition. I was working in IT at the utility company at the time, so went in-person to fetch the meter box... asked for the biggest box they would provide. We ended up with a Siemens brand commercial grade model including lift handle they can swap the meter using and not disconnecting the load while swapping the meter. Next to that I placed a Square D main breaker disconnect. I wanted a physical space between the main and the load center inside.... so I could install Delta brand lightning protection devices. Outside is their model LA-302 Lightning Arrestor, and inside is their model CA-302-R Surge Capacitor. Inside is a Square D QO line 42 space load center. I wanted the 42 space as it has more height so easier to route all the wires before the circuit breakers begin. The part of the basement where the electrical panel is used to be the behind house well room. I cut off the well below the new grade, cleaned it up with a wire brush on a drill, then drilled holes through the 2 inch pipe. I ran a 1/0 copper in a PVC conduit up to the location of the new load center. I split in half the conductor strands of the 1/0 into two separate ring tongue connectors, bonded with bolt through the well pipe, made it good and tight, then bubble wrapped and taped the bond, then it got covered with pink board to insulate for heat pipe installed in the slab.... I have radiant floor heat in my basement office. The driveway is directly next to the house on the meter box side, so while putting in the new service, I ditchwitch cut through the blacktop driveway to the opposite side where there is grass.... a first 10 foot 3/4 inch ground rode there. then about 10 foot along the drive way, a second 10 foot 3/4 inch ground rod. I ran a #2 bare copper from the main to those rods. From the electrical panel there is another #2 copper that runs through 3/4 inch conduit to the front of house water meter, bonded and jumpered that... (all one continuous piece mind you!), then that continues farther front to bond to the new / relocated gas line, and finally terminates at the front communications box I previously mentioned. Inside that gray plastic box I mounted a Square D ground bus, so bonded to that, then continued to yet another 10 foot 3/4 inch ground rod out in front of the house in the same trench I put the 2" PVC communications conduit in. The original plan was to feed 100 amps to the detached garage, a Square D QO load center out there, fed by all #2 copper, and behind the garage is yet another 10 foot 3/4 ground rod. So in total, four of 10 foot 3/4 ground rods connected via #2 copper, a bond to the original well via a 1/0 copper, passing through the copper water main via bonding #2, an ample Delta brand lightning protection devices. About your avocation to use expansion joints: YES!! 20 years ago when we did our service upgrade, I did not know of PVC expansion joints. I only knew of cast metal expansion joints, for use with rigid steel pipe. Winter freeze / thaw broke just the 3 inch PVC entrance to our meter box, and the 1 inch PVC for the ground lines across the driveway. The later breakage was worse, took the bottom of the main breaker box with it. A couple of years ago, a sparky friend and I coordinated doing the repair. Yes, very similar pre-planning to insure all needed parts were on-site. This time I was thinking to put the molded female ends of new sticks of PVC facing down and not glue those joints. I noticed the same PVC expansion joints available at the parts store, and abruptly changed plans! Fortunately Square D had not changed the main breaker box design in the 18 years, and more fortunately our meter box was completely undamaged. Also background about our original installation... We put sections of 2-by bolted to the side of the house. Then our builder aluminum wrapped the boards. That provide a flat mounting surface for our meter and main disconnect. We did the same for where we relocated the gas meter to during the same construction. I highly recommend that practice for preparing for mounting locations for utility metering and related disconnects. The sparky buddy of mine executes his work with near same accuracy as this fussy home owner, and about 4 times faster! The particular morning, utility was there to disconnect the slip-joints for our underground feed at the front pole. Then we set to work disconnecting / reconnecting. The utility crew left their phone number that we could call them once we were ready to reconnect. We called them directly to return to reconnect.... they said they had just finished a job, so were wondering if we might be ready yet. "Perfect timing!" Shortly after the utility reconnected, resealed the meter, then the electrical inspector passed though, provided the "pass" sticker on the meter box cover. ALL OF THAT in a morning, concluding with the electrical service inspection just after lunch. Wow that worked out faster than greased lightning!!! "Many hands make lite work." Or as a wise guy once wrote... "Two heads are better than one.... and a three fold cord is not easily broken." Also sometime 20 years ago.... that year in c2c, Exodus 18:22 hit me like a ton of bricks.... Moses hearing advice from his father-in-law, "This thing you are doing for the people, it is not good. You need helpers so the work will be easier." The word "retire" as it relates to work is not found anywhere in the Bible.... the word "easier" is found in that context!

  • @NonstopBigVisc
    @NonstopBigVisc Жыл бұрын

    Nice job, that's some serious hard work. Love your channel and enthusiasm. Not a fan of that burnt PVC offset tho 🤔

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    😅Fair.

  • @chetlockwood1491
    @chetlockwood1491 Жыл бұрын

    The experience and challenges will shape your boys forever, there are very few kids that get the kind of exposure those guys have, they have a leg up. Awesome job, I can commiserate with you, at 71, I installed 12kw of solar and all the associated paraphernalia, inverters, batteries. and additional panel. I will move more circuits to it as I grow the battery capability, I will install another 4.8 kw of solar in the intermediate future, not this year, but it's coming.

  • @gregchambers6100
    @gregchambers6100 Жыл бұрын

    Yep. PVC heat blanket's are sweeet. I really like the hot box also, we always had Greenlee.

  • @cyrysvonnachtseite4546
    @cyrysvonnachtseite4546 Жыл бұрын

    Damn. We’ve been pulling out 1,200 amp building services…. Putting 400 amps ….400amp to 250 …. New buildings. All LED and super savings motors

  • @clarenceeverline5654
    @clarenceeverline5654 Жыл бұрын

    Brother you are to awesome i wish you lived in Ga, i would love to work for you you have a fantastic attitude

  • @Podmore1000
    @Podmore1000 Жыл бұрын

    "And by remove I mean hide!...poof!" I died laughing, so relatable with ANY remodel electrical project

  • @bmoulas
    @bmoulas Жыл бұрын

    Genius, adding a subpanel to the EV meter on an 'honor' system. I am sooooo going to do this same mod this winter.

  • @elcano9l52
    @elcano9l52 Жыл бұрын

    Assistant Electrician here, on the way to Master. We recently did our home from 100a to 200a service, because we kept burning 100a push-in main breakers with our 11.5kW EV charger. We moonlighted the whole project with big excitement. Meter and main disconnect with fully redone cad-welded grounding electrode system, to a 200 amp ATS for the diesel standby, and then off to an outdoor 200 amp panel which distributes to the home sub panel, garage sub, grid-tie solar AC feeder, etc. I really felt we were dealing with big home stuff, specially now that we can charge our 2 EVs simultaneously, but man, now this right here is big league pure electrical porn lol. Thank you for sharing this project.

  • @MrLiamHenderson
    @MrLiamHenderson Жыл бұрын

    This is just beautiful

  • @SavedByFaithInJesus
    @SavedByFaithInJesus Жыл бұрын

    The eyes when when you asked "When is your hard stop?" Bro-- 4PM minus drive time back the the shop.

  • @swervomatic

    @swervomatic

    Жыл бұрын

    Are you a quiet quitter?

  • @sirkllr
    @sirkllr Жыл бұрын

    Awesome that's hard core

  • @paulerenberger1286
    @paulerenberger1286 Жыл бұрын

    Helpful tip: multi tool to cut the conduit when you can’t pull wires out of the way

  • @chaseblacketer6724
    @chaseblacketer6724 Жыл бұрын

    I also do electrical in Indianapolis in all the old homes off north meridian. The sad things is I feel alone on my work ethic. I can’t get anyone to help me with side jobs. I love working and wanna grow and I can’t do it on my own. But your positive attitude reminds me of my own and I have hope there will be help out there for me after I take my test and go out on my own.

  • @rty626
    @rty626 Жыл бұрын

    Hello, I am a big fan of your channel, THANKS for sharing your knowledge. Can you please share how would you identify phase A or B on service panel? I am talking about the lugs coming from outside. Due to my work I need to know which one is A or B. Thanks for everything, GREAT Work!!!

  • @niccolesrobertson5954
    @niccolesrobertson5954 Жыл бұрын

    Everything looks great my only question . .wheres your EGC for all the equipment

  • @joshuaskirvin
    @joshuaskirvin Жыл бұрын

    Almost 20 years ago now, I wired a house that is 15,000 square feet. It had a 1,000 amp service. Five 200 amp panels and seven freaking A.C. units. LOL

  • @makeitpay8241

    @makeitpay8241

    Жыл бұрын

    that sounds like Al Gores house

  • @cmiller6352

    @cmiller6352

    Жыл бұрын

    @@makeitpay8241 Edgy.

  • @Kangenpower7

    @Kangenpower7

    Жыл бұрын

    I can understand the 5 main breaker panels, but I might also have guessed they would have several sub panels someplace else in the home, garage, and so on, to avoid a lot of long distance home runs to the 5 panels. I would think they would need one sub panel just for the kitchen circuits! 7 HVAC units means about 2,100 square feet per unit, that seems a bit undersized? I guess it depends on how hot it is in that location.

  • @joshuaskirvin

    @joshuaskirvin

    Жыл бұрын

    @@Kangenpower7 This was in Fayette County Georgia. This may sound pretentious, but we planned out our work before hand. On projects this large, there is also virtually always an architect and an engineer designing things. Most crews would just show up and pull whatever the prints called for. We didn't run quite that way. There were five of us in our crew and according to the largest supply house in the area and Southwire themselves, we pulled more Romex than any other crews on the south side of Atlanta. We always approached any project as if we were the homeowner. A "What would I want in my house?" kind of a thing. If you plan your work properly, there's absolutely no need for sub-panels in new construction. Especially when money is virtually no issue.

  • @rupe53

    @rupe53

    Жыл бұрын

    We worked at a home years ago that had 21 (twenty-one) AC units when finished. The original home was almost 10,000 sq ft with only one bedroom. It was an 800 amp service. Renovations brought in another 10,000 sq ft. (and more bedrooms) Architect called for a 1200 amp upgrade and the contractor was too cheap to dig a 900 ft trench.

  • @thereedbreed
    @thereedbreed Жыл бұрын

    Wedge anchors in concrete or brick also work extremely well

  • @jarrydee2799
    @jarrydee2799 Жыл бұрын

    you must love this stuff. I would have quit a long time ago and started back up the next day

  • @jeepanon
    @jeepanon Жыл бұрын

    to make your life so much easier when mounting those cabinets, i usually mount a piece of unistrut along the whole area, then you can just rest all your cabinets on it. then you can mark it and mount it with little to no weight to hold up.

  • @Kangenpower7

    @Kangenpower7

    Жыл бұрын

    A temporary table made out of unistrut would be great to support the panels and other heavy stuff, then take it apart when the job is done. I used a fishing box to hold various 3/8" bolts, nuts, and washers, along with the unistrut nuts, and other fittings, 90 degree, ect. It was handy to not need to go back to the warehouse for more bolts and stuff while working with unistrut. I used the unistrut and a overhead 1/4 ton chain fall lift to pull out motors and pumps while doing HVAC and steam repairs. 5 HP hot water pumps are impossible to hold up with one hand while getting the bolts tight! I was also thinking about suggesting a pair of saw horses, cut to the right height to hold up the panels, maybe with a stack of 2X6 to get the height just right.

  • @ragnor56
    @ragnor56 Жыл бұрын

    You have a top grade fire protection system in place & the whole building is insulated for fire control?

  • @beemerkon
    @beemerkon Жыл бұрын

    Dude giving props to line man's put one of those guys in a house and see how they do trying figure anything out

  • @ChadwickFerguson
    @ChadwickFerguson Жыл бұрын

    carbide oscillating tool does cut at least 2" GRC especially for hangnails

  • @hunterallen4925
    @hunterallen4925 Жыл бұрын

    What brand is that secondary CT metering cabinet?

  • @jovetj
    @jovetj Жыл бұрын

    Joel: You're the new Tim "More Power!" Taylor!

  • @gilbertzaragoza5014
    @gilbertzaragoza5014Ай бұрын

    I’ve always enjoyed watching your videos, but I haven’t watched your videos in about little over a year. I just thought of watching them again more newer ones and I’ve noticed that you’re using a lot of Dewalt power tools. I remember you were highly recommended Milwaukee power tools. I just thought it was a little strange in the change but it all depends on what you like. Best doing your good work and I enjoy watching your videos again. God bless.

  • @ElectricProAcademy

    @ElectricProAcademy

    Ай бұрын

    An accurate observation. We've recommended Milwaukee to our guys individually and purchased several of our company tools, such as coring drills, from them as well. The reason I don't use them is simply because 1) My DeWalt tools just won't die and 2) I'm not in the field nearly as often.

  • @taylormills08
    @taylormills08 Жыл бұрын

    If you have a heat blanket throw a cotton towel or sweatshirt around it. Achieves bending temp in half the time or better.

  • @mar1video
    @mar1video Жыл бұрын

    This is better than Netflix ❗️

  • @SeekingTheLoveThatGodMeans7648
    @SeekingTheLoveThatGodMeans7648 Жыл бұрын

    What a honkin' wiring setup. What I would first think about is that it would require a significantly upsized drop from the utility whose availability would depend on whether they're set up for commercial service or you can pay them enough to put that in. The ordinary 100 or so amp drop to a residence would obviously not cut it, especially if it comes off a pole. I kind of dabbled in wiring additions in a home I had in an area where the permitting authority was comparatively lenient to that, including adding a kitchen subpanel, but nothing of this scope or expense (even by DIY standards). Personally, for heating, if not also cooking (I decided to go old fashioned coiltop electric), I'd still want gas. Other stuff, go wild with the juice.

  • @arcadeuk
    @arcadeuk Жыл бұрын

    Me in the UK "Can I upgrade my 80amp to 100amp" UK Power Company "NO, there is not capacity in your area" Government "You need to get an electric car, an electric boiler and electric heat pump to meet Net Zero targets" Me in the UK "HOW AM I SUPPOSED TO DO THAT?"

  • @charlesjohnson6073

    @charlesjohnson6073

    Жыл бұрын

    Lol can't win can you!! I know how I feel 🫣

  • @aa999xyz
    @aa999xyz Жыл бұрын

    looking sharp, what about purchasing a portable solar generator for your customers to use while power is down especially for their refrigerator? 3000w version?

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    We are looking into this or portable battery solutions! We'll be sure to post on it if we find a solution we like.

  • @Joe-qw6il
    @Joe-qw6il Жыл бұрын

    I started out replacing outlets, than adding new outlets/new breaker circuits, replacing ceiling fans then adding entirely new ceiling fan locations on their own breakers, then installed an entire central air system, then had to upgrade an old zinsco 100A breaker panel with a 200A square D, then moved, been here at my new home several years now, just installed a 10kW solar panel system on my home, did it all myself, all permitted, all passed, and saved myself a lot of $$$ by doing it all myself, and it all started with changing out an old outlet!

  • @carbongrip2108
    @carbongrip2108 Жыл бұрын

    Awesome video, very clean results. I do have to say those panels are comically large for what they are, why on earth they require that I don't know. Couldn't you have done a single box with 3 meters on it like an apartment building?

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    Agreed! They were supplied by the utility company, but we think it was at least partially supply chain driven (22:26)

  • @jovetj

    @jovetj

    Жыл бұрын

    @@ElectricProAcademy So, are you happy with how this turned out? I got the impression in the video that some of these panels are temporary-permanent. That other panel to the south also seems kind-of redundant now. Are you wanting or planning any more changes in the future?

  • @Duct88
    @Duct888 ай бұрын

    I’m so jealous!!!! I have 200 amps and I need more!!

  • @Byron88
    @Byron88 Жыл бұрын

    My only concern would be with the liquid -tite not sure of the codes there but the liquid Tite isn't considered bonded here which would have required you to run an additional ground conductor the whole length of the existing feeders / or put a JB with a bonding bushing on the liquid Tite side to ensure electrical continuity from distribution box to the house panel

  • @illestofdemall13

    @illestofdemall13

    Жыл бұрын

    Metal liquid tite.

  • @Byron88

    @Byron88

    Жыл бұрын

    @@illestofdemall13 I'm also referring to metal liquid Tite we have to send a ground through it here as well, rigid and EMT we don't

  • @jovetj

    @jovetj

    Жыл бұрын

    @@Byron88 I think he was joking. 🙂

  • @charlesmiller7861
    @charlesmiller7861 Жыл бұрын

    12:10 am, not pm.great work.

  • @MrTooTechnical
    @MrTooTechnical Жыл бұрын

    Trust me. The way u did it, is better than span. Kick ass

  • @andyluo1389
    @andyluo1389 Жыл бұрын

    Good job overall. Only thing I am not so sure about is the way you bend your PVC offset.

  • @robertr2174
    @robertr2174 Жыл бұрын

    I think lines should be anchored down where they land more yhan whre they sit. . So it's added strength and saftey. Kind of like a fail safe type thing 50 years down the road.

  • @ArkBobOp
    @ArkBobOp Жыл бұрын

    Your channels gonna blow up bro! Start preparing now for some major growth, kudos to you

  • @svdleer
    @svdleer Жыл бұрын

    I'm from the Netherlands, i always wonder why they make power upgrades so difficult (al those new cabinets, feeds, panels, linemen, and so on) in your country. But very nice job, challenges are always nice.

  • @wizard3z868

    @wizard3z868

    Жыл бұрын

    a lot of it is due to gobernment corruption and union labor the lazy and incompetant need to eat too lol its the land of the fee (not free) home of the slave (not the brave) those times have past at least 4 scores ago lol

  • @quinnbattaglia5189

    @quinnbattaglia5189

    Жыл бұрын

    How are things done over there?

  • @svdleer

    @svdleer

    Жыл бұрын

    @@quinnbattaglia5189 In most cases for normal home connections it's just a new breaker or adding a breaker in the sealed compartiment of the power company. It hardly requires new panels and this kind of work

  • @quinnbattaglia5189

    @quinnbattaglia5189

    Жыл бұрын

    @@svdleer We can add new breakers too, but the main panel and meter are only rated for so much current before it becomes a fire hazard. Especially when the equipment is decades old. Am I misunderstanding you or does that mean you have to contact your utility to run a new circuit?

  • @svdleer

    @svdleer

    Жыл бұрын

    @@quinnbattaglia5189 ofcourse we replace the boards here as well if the stuff is rejected by code. But indeed, you need the utility to install new breakers to upgrade the service. It depends if the lines to the service need to be replaced, but since almost everything runs in the ground the lines are overrated for the service that is being used, they only need replacing for example when your line is very old, and you go from example single phase line to 3-phase line and the line does not have more conductors. Usually when they have massive street reconstructions and cable of gaslines are getting old, they upgrade the lines and gaslines to new standards in the same reconstruction.

  • @mike6l6
    @mike6l6 Жыл бұрын

    If you heat the pvc whist laying on the ground , it will heat quicker and less chance of burning .

  • @feriadelpueblo
    @feriadelpueblo Жыл бұрын

    sad that yuor helpers lefth you alone at night or at lesast it seems that way, exellent work and even better your attitude when working, greetings from Mexico.

  • @aliaksandryurenia8093
    @aliaksandryurenia8093 Жыл бұрын

    Why you didn't install span panel for your home?

  • @NextGenEvs
    @NextGenEvs Жыл бұрын

    Love the Tesla hat!

  • @Sebanisu
    @Sebanisu6 ай бұрын

    It's odd watching a channel that is local. I used to live in Indianapolis and I live up in Lafayette now. You guys say a road name and I know where it is lol. I saw you on StudPack so I decided to check out some of your videos.

  • @kramit269
    @kramit269 Жыл бұрын

    We’re is slip coupling out of ground conduits ?

  • @lorenrickey5481
    @lorenrickey5481 Жыл бұрын

    S-P-I-D-E-R-E-R-S!!!! That’s why I wear gloves and long sleeves. Spider armor! Thanks for letting us watch! That was interesting.

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    😂

  • @DUSTEATER2
    @DUSTEATER2 Жыл бұрын

    I didn't know you could bury a LB inside the wall. My inspector told me to put an access panel over it. Also burning the PVC was poor workmanship in my apprentice days.

  • @DragginNuts1
    @DragginNuts1 Жыл бұрын

    ive used a rice cooker to pump steam into a capped 4" PVC tapped with a 3/8" barb fitting on either end and she radiused consistently to 90* over the full (8') length NO hands just sitting on 2 saw horses.

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    That is outta this world. Did you really or are you pulling my leg?!?!?!

  • @DragginNuts1

    @DragginNuts1

    Жыл бұрын

    @@ElectricProAcademy ok it was more like 45* not 90* but still. I was actually trying to steam bend wood inside the 4" pvc and it totally warped the pipe while I was in the other room (and bent the wood!) love your content btw!

  • @Kangenpower7

    @Kangenpower7

    Жыл бұрын

    Thinking about this, I have a 6 quart pressure cooker, and it has a barbed type fitting on the top. So it "Could" be connected to a PVC line to what he did, just make sure you have more than 2" of water in the pressure cooker, and then connect the line with something that will not melt at 300F. Then a portable induction 120 volt stove will heat the pressure cooker, and warm the pipe from the inside. It might be worth trying it out? I have a copper chef 120 volt induction stove, and can use my SS pressure cooker on it (to cook dinner, have not tried cooking PVC yet). ($60 on Amazon). The nice thing is the steam will condense inside the PVC at about 215F at about 1 PSI. So you are not likely to overheat the PVC pipe for a long time, and it should warm the pipe the total distance of it, not just one area. You might still need to apply some heat to the general area of the bend, but you should be able to complete the bend without the color distortion that you had in your home.

  • @DragginNuts1

    @DragginNuts1

    Жыл бұрын

    @@Kangenpower7 the beauty of the rice cooker is it just plugs into the wall. No stove needed. Just cap both ends of the pipe you want to bend add a barbed fitting going through one of the caps and a small vent hole in the other cap and connect it to a rice cookers steam outlet w/ 3/8" silicone hose or any hose (that wont melt from steam). Pipe wont get very hot on the outside wall either just un-cap it bend it into place and it will cool down and get rigid. best part is you can make Sushi for lunch at the same time!

  • @Kangenpower7
    @Kangenpower7 Жыл бұрын

    Have you thought about going to a Ford E Van? Then they can install a 80 amp 240 volt charger at a home, and refill the van on the overnight low cost power. That is terrific that they offer such low cost power in your state. I live in Portland Oregon, and recently changed to a 5-9 pricing program, where I pay $0.32 per KW between 5 pm and 9 pm, weekdays, and get lower cost power all other hours of the day, and weekends. So far I have averaged 32 KW of the peak power each month, while I have 750 - 950 KW non-peak power each month. I am all electric and installed my 4 ton heat pump myself, I install HVAC for a living. I have a 200 amp service, and plug in hybrid Ford C-Max, with a 7.5 KW battery and 4 cylinder engine. It gets 40 MPG on gas and 18 miles on battery power. I installed a 16 amp 240 volt charger, much lager than this car needs. I put my water heater on a timeclock, and shut off my refrigerator 7 pm - 9 pm, to reduce my peak power hours, and remember not to run my heat pump on peak power. Great video!

  • @davidbeaman3255
    @davidbeaman3255 Жыл бұрын

    You don’t need expansion couplings if the ground is backfilled correctly think about it. If your pipe expands, how does your wire expand too?

  • @throttlebottle5906

    @throttlebottle5906

    Жыл бұрын

    you leave slacked wire in the run.

  • @davidbeaman3255

    @davidbeaman3255

    Жыл бұрын

    @@throttlebottle5906 lol how do you do that with SE cable hardly any slack

  • @sammyyourmammy8170
    @sammyyourmammy8170 Жыл бұрын

    What state and city is this dude located in ? New exposed PVC conduit at less than 6' above finish grade?

  • @JohnSmith-bo6ff
    @JohnSmith-bo6ff Жыл бұрын

    What are you call8ng the Gold book ? The NEC?

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    No, sorry. We've mentioned it in other videos but glossed over it here: Our local utility company's standards are called the Goldbook, and since they're the AHJ it trumps NEC if/whenever they conflict

  • @mikemarshall1394
    @mikemarshall1394 Жыл бұрын

    I see no ground rods. Are you installing one per panel?

  • @TheFlow2006
    @TheFlow2006 Жыл бұрын

    phew what big conductors you have to use there, really not hatin but im glad that we have three phase power with 230V over here, we get along with less than half the wire thicknes than you need and thanks to rcd´s (or gfi´s as you call them) its as safe as your system over there.

  • @ScotReeder
    @ScotReeder Жыл бұрын

    Would it have not worked cutting the interior wall of the carriage house than cutting the brick?

  • @wizard3z868
    @wizard3z868 Жыл бұрын

    and i was being called insane/mad for suggesting 400 amp services for homes+garages and e/v's

  • @FrankGehann
    @FrankGehann Жыл бұрын

    Coming from germany this looks so messy for a "new" install but well we also have 3-phase 380V up to 63A for a normal house over here to our advantage :D

  • @Kangenpower7

    @Kangenpower7

    Жыл бұрын

    Germany and Europe in general have home service that can be 3 phase, and even if single phase is normally 220 volts phase to phase. So much higher voltage than in America. Vacuum cleaner, refrigerator, TV set, all are 220 volt in Germany and Europe.

  • @richwinegar5517
    @richwinegar55176 ай бұрын

    Good job, roughly where are working?

  • @ElectricProAcademy

    @ElectricProAcademy

    6 ай бұрын

    Indianapolis, IN

  • @rikardlalic7275
    @rikardlalic7275 Жыл бұрын

    Real challenge...

  • @MJ-iy4fb
    @MJ-iy4fb Жыл бұрын

    Nice work, I have to ask, why did you need 1000 amps ?

  • @jovetj

    @jovetj

    Жыл бұрын

    Home+home-refurbs, Electric vehicle charging and future-proofing, and a little extra for the carriage house.

  • @marloweweissman6034
    @marloweweissman6034 Жыл бұрын

    Did the power company give you the 400A EV panel so you can charge more cars at the same time at the reduced rate?

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    Yes, in our jurisdiction the reduced night-time rate can be used for a dedicated meter of any size.

  • @jesseestrada4290
    @jesseestrada4290 Жыл бұрын

    We use a hot oven or a hot blanket to bend pvc no open flame allowed in Cali, occasionally I’ll use open flame in a controlled setting with a fire extinguisher on hand or just a wet rag.

  • @JamesHalfHorse
    @JamesHalfHorse Жыл бұрын

    Wired a house when I was 14. Got an IT job a year or two later. That was 25 years ago. Should have stuck with being an electrician. Put in all the utilities and electrical for my farm. Trying to talk the power company into 400 amps and not have them complain to much about the 80kw generator I have and I work on 3 phase radio transmitters on the regular. I think I am going to learn some stuff on this channel. Oh and as much smack is talked between the trades I have to say thank you as a low volt guy whenever you guys put in extra pipe for us when you trench. I do my best to work with the other trades but I am a company of one too and it's hard to get all that coordinated so when you look out for me like that it is appreciated and the customer appreciates it.

  • @persona250
    @persona250 Жыл бұрын

    Core drill on hammer ???

  • @taylormills08
    @taylormills08 Жыл бұрын

    I have to ask. Couldn’t a span panel or two eliminate the need for this huge upgrade? Although the old equipment was in rough shape so I don’t slight you for doing it.

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    Exactly. 1:11:42. We didn't actually know about SPAN before doing this project, but it could have relieved us of several of the elements of this install!

  • @branetraveler
    @branetraveler2 ай бұрын

    Any surge protection?

  • @ElectricProAcademy

    @ElectricProAcademy

    2 ай бұрын

    Yes! As we put in EV charging in this video: kzread.info/dash/bejne/gGqns9uMn8bZhKw.htmlsi=n9o_8rZTpxzMRJKl&t=458

  • @jovetj
    @jovetj Жыл бұрын

    Drew sounds like my kind of awkward guy. 👍 Probably intimidated by the -CEO- boss!

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    Drew is a rock star! Way ahead of the curve and such a versatile asset for Jefferson Electric.

  • @volt_nightroleplayminecraf6998
    @volt_nightroleplayminecraf6998 Жыл бұрын

    How mutch did the eletric bill go up by?

  • @ElectricProAcademy

    @ElectricProAcademy

    Жыл бұрын

    None thankfully. The bill is only dependent on consumption, which I didn't increase. I only increased my ability to connect future loads. :-)

  • @adammurdoch1708
    @adammurdoch1708 Жыл бұрын

    Man the guys who designed the US grid must of owned copper mines!

  • @jovetj

    @jovetj

    Жыл бұрын

    Why? Copper is the best conductor for the price. It's really quite excellent, and it's used all over the world for that purpose. Aluminum works in a pinch.

  • @adammurdoch1708

    @adammurdoch1708

    Жыл бұрын

    @@jovetj I know it's the best conductor for this application but the low voltage and thus high current requirements for US home power uses 4 times the conductor area that most of the rest of the world would

  • @jovetj

    @jovetj

    Жыл бұрын

    @@adammurdoch1708 The thickest cables in homes are, obviously, service entrance wiring. Most of those are aluminium here. Perhaps you don't realize that the "low-voltage" wires in most home circuits are 2mm² or 3mm². Circuits sized bigger than 4.8kW are almost always 240V. A 50A electric stove/oven circuit gets the equivalent of 13mm² cable.

  • @adammurdoch1708

    @adammurdoch1708

    Жыл бұрын

    @@jovetj yea I know 13mm2 cable wouldn't be used outside industrial applications here and a lighting circuit will be using 1 or 1.5mm even stove circuit is only 3mm as it also uses 2 phases and that would be the largest in most homes

  • @jovetj

    @jovetj

    Жыл бұрын

    @@adammurdoch1708 Oh, "you know?" So what is your point, again...? Our wires are too big because of 120V?

  • @thedangler1371
    @thedangler1371 Жыл бұрын

    I would of stayed late to help u out lol 😅. Your an amazing boss.

  • @number1pappy
    @number1pappy Жыл бұрын

    Just out of curiosity, what's your monthly electric bill?

  • @bramcoteelectrical1088
    @bramcoteelectrical1088 Жыл бұрын

    what the hell you running bro?? 1000amp supply you must have a big pool beer bar :) good work sparky from uk.