Setting up profiles and setting the gauge

Пікірлер: 8

  • @karltwigger3989
    @karltwigger39896 ай бұрын

    Workmanship at its finest. Great video

  • @HandwerkerScheune58
    @HandwerkerScheune586 ай бұрын

    Moin, es ist immer wieder schön, bei anderen Handwerkern zuzugucken um zu sehen, wie es bei denen auf der Baustelle gearbeitet wird. Top Job, gut gemacht. Grüße aus Hamburg 😁😁🧱🧱😁😁

  • @ironpirate8
    @ironpirate86 ай бұрын

    How did they do this in the old days Rob? I know there are optical levels and water levels, but even a water level needs a hose pipe of some kind. Did they just start at a point and check level as they worked along?

  • @neilu.k.1364
    @neilu.k.13646 ай бұрын

    I got taught to plumb bob down from wall plate height on each corner when setting out a timber frame Rob. If the timber frame isn’t plumb you might be right at the bottom but by the time you get to the top you could have varying cavity widths due to the timber frame being out.

  • @robsonger1

    @robsonger1

    6 ай бұрын

    yes, thats an excellent point and one I should have mentioned, thank you. The carpentry company we always use have an excellent reputation and when Neil, Frank and Darren turn up, we very very rarely have to check anything, but we still do for extra peace of mind. The only problems we found were changes on opening sizes to those that we had on our drawing. Thank you for your comment.

  • @maxpower1797

    @maxpower1797

    6 ай бұрын

    Plumb bob down from the soffit

  • @neilu.k.1364

    @neilu.k.1364

    6 ай бұрын

    Sometimes the soffit isn’t on or other firms I’ve worked for do them when the brickwork is finished

  • @SteveAndAlexBuild
    @SteveAndAlexBuild6 ай бұрын