Repairing of Landfill project HDPE capping,which deal waste 400tons/day

Repairing of Landfill project capping as a 8 Grade wind.
The landfill project area 150000sqm, can deal waste 400tons/day.Landfill system, mainly including waste dam, anti-seepage project and leachate storage tank; sewage treatment, the daily capacity of 150 tons is designed.
The treatment process is mainly based on biochemical treatment and combined with physical-chemical treatment. After anaerobic, precipitation, biochemical, filtration and other processes, the treated intermediate water reaches the level-3 discharge standard.
There is a biogas digester for power house,which can make 857kw/day.