(RAW) First time using SRT in a long time, while removing three 100' pines.
The raw unedited video of while waiting for my new rope do that I could continue using DRT I was left with the only option being to use SRT for these three pines. Lucky for me it ended up working out great, because I was able to simply throw my line into another tree and make descending while chunking down the trees a piece of cake.
Part 1: • First time using SRT i...
Part 2: • First time using SRT i...
Part 3: • First time using SRT i...
Пікірлер: 9
Brilliant as always.sudden end.loved the safety precaution.thanks big guy.
Awesome job brother
Saya sangat kagum dengan keberanian anda di atas pohon , disana pohon nya sangat sangat tinggi,, Saya memanjat tiap hari besar tapi pendek😊
What system do you use on your wire core ??
a quick question for you I have two or three companies that do that and they use the small strap two or three branches at a time why you these just a thank you
Why don’t you tip tie the wood??
@ReallyTallTreeGuy
3 ай бұрын
I don't like how violently it comes off. I like that when I mid tie. It gradually loads the load line.
What is a SRT?
@ReallyTallTreeGuy
Ай бұрын
SRT is Single Rope Technique. So that pretty much means that I move up and down the rope as opposed DRT or Dual Rope Technique where the rope moves while I move up and down it. There are advantages to both SRT and DRT, but one advantage that srt has is that it is very simple to toss the line into a neighboring tree and have the ground crew tie in on.