Piccadilly Line upgradePWI London Section meeting (Hybrid)12 June 2024
The Chartered Institution of Railway Engineers embraces the IMecE, ICE and IEE!
‘PWI’?
will the trains be faster
No, but new methods of signalling like TBTC will increase the TPH on the lines which will make everything a lot quicker, with less waiting times.
Пікірлер: 4
The Chartered Institution of Railway Engineers embraces the IMecE, ICE and IEE!
‘PWI’?
will the trains be faster
@richardashworth400
14 күн бұрын
No, but new methods of signalling like TBTC will increase the TPH on the lines which will make everything a lot quicker, with less waiting times.