Old E7 set up to contactor and smart meter.

Пікірлер: 15

  • @Martyn-ey9lw
    @Martyn-ey9lw5 ай бұрын

    I always used to take the fuse out of the holder as it could have a jumper around the back that you can't see without removing the fuse, have found a couple in the past. In the old days the time switch was always fed from the supply side of the meter so the customer wasn't paying to the T/S.

  • @sergiofernandez3725
    @sergiofernandez37256 ай бұрын

    Really enjoyed this and found it educational. On the back of this video I have subscribed to your channel 2 Questions if I may 1) Do the screws in the meter and cut out not need to be tighten to a specific torque of Xnm (newton meters)? 2) Why is a double poll isolator not fitted after the meter?

  • @MarksElectricMeterExchanges

    @MarksElectricMeterExchanges

    6 ай бұрын

    Some companies use torque screwdriver, some don't, the is no set rule , not a fan of them myself as if the torque is incorrectly set you in a pickle , when tightening by hand , once you feel the spring of the tight screw through your wrist that's tight enough . Ref an isolator you would only fit one as a customer request as the job was a like for like recert / upgrade . Thanks for subscribing. Please watch my other videos and let your friends etc know about the channel , if you need any more information just ask 👍

  • @davidproctor6359
    @davidproctor63592 ай бұрын

    Contactors: What they are for and how to install one. thanks

  • @rayparry5234
    @rayparry52346 ай бұрын

    Is it not good practice to install an isolator between the meter an consumer unit.

  • @MarksElectricMeterExchanges

    @MarksElectricMeterExchanges

    6 ай бұрын

    Only when requested by the customer , metering companies will not fit them otherwise due to cost .

  • @bendowne001
    @bendowne0014 ай бұрын

    How do you know that the contactor is operational on completion of the changeover?

  • @MarksElectricMeterExchanges

    @MarksElectricMeterExchanges

    4 ай бұрын

    The office can dial into the meter and set the timer in it to operate the contactor as a test .

  • @SME_Ste
    @SME_Ste6 ай бұрын

    Why once the supply is proved dead at the meter terminals, do you have to then test at every point on the tails?. Would’ve also thought that the least amount of times you remove the cutout terminal shield the better.

  • @MarksElectricMeterExchanges

    @MarksElectricMeterExchanges

    6 ай бұрын

    It's meter company specific regarding dead testing blocks/Isolators before an exchange, some do , some don't , I prefer to test all equipment I work to prove it's safe . Thanks for you view though .

  • @SME_Ste

    @SME_Ste

    6 ай бұрын

    @@MarksElectricMeterExchanges No worries, just seeing at a general view from someone not approved to work on meters.

  • @bendowne001
    @bendowne0014 ай бұрын

    Very surprised you use the terms live and neutral and not phase and neutral as they are both considered to be live conductors.

  • @matt4436
    @matt44366 ай бұрын

    What is the point of this clock/Contactor? What does it supposed to do?

  • @MarksElectricMeterExchanges

    @MarksElectricMeterExchanges

    6 ай бұрын

    The contactor that was fitted to replace the timeclock is switching the customers own contactor built into the building , for example a church where a 5 terminal meter cannot be used .

  • @user-hu4kw3ym2r
    @user-hu4kw3ym2r6 ай бұрын

    Hello! Thank you and hope you are very well. Your video-making is very good.Your content ideas are very good.If you give me permission, I will share some information with you to increase the channel. You got lots of subscriptions and views. Can I suggest growing your KZread channel?