MOD-11|||POINTS AND CROSSING IN RAILWAY TRACK.|||RAILWAY ENGINEERING
#TechnicalstudyTE #Pointandcrossing
Welcome to my channel,
So in this video we will discuss about the point and crossing in railway Engineering.
So I show you though practical how the point and crossing are really work.
Through my video I share you full information regarding the point and crossing.
point is that place where two train are change From one track to another track.
point are designed as the rail length and design based on the load and intensity of the raily track.
the point are various rail are used these are .
1.tongue RAIL
2.stock rail
3.poe rod
4.1st stretcher bar
5.2nd stretcher bar
So this is the various components used in the point of the railway track.
and the point are designed as two basics formula.
1. 1/12-60kg per meter length rail.
2.1/8.5-60kg per meter length rail.
I show you both formula are used to design the point and crossing of the railway track.
Crossing=Crossing is that point where two train are meet together and they change their track From one track to another track.
Crossing are various term used as.
1.Wing rail
2.check rail
3.Actual nose throting
4.theoritical nose throting
so This is the general components used in the crossing.
if you have any questions regarding This topic then please comment on my video and try to reply your answer.
you can also connect with social media.
If you want to join with me then you can connect with the social media.
If you want to connect with me then join on my Instagram.
mahaseth.sa...
you can also connect with me on tweeter it's my official account.
mobile. SantoshMah...
If you don't suscribe my channel then please suscribe my channel and press bell icon for latest update on KZread.
technicalstudyTE
TECHNICALSTUDYTE
/ technicalstudyteengineer
Пікірлер: 19
That speech is perfect so i like your speech
nice video
Nice 👍👍👍
Good
@technicalstudyTEengineer
5 ай бұрын
Thanks
good
@technicalstudyTEengineer
8 ай бұрын
Thanks
Master ji explain with all with demential / clearence
@technicalstudyTEengineer
3 жыл бұрын
Okk
If ATS is taken as stn 0 for 1 in 8.5 crossing then, What are the standard values of cross levels at stations which are 3m apart.
Fish plates bolts hoc side to side
Aap bihar se ho lagata hai thik hai
@technicalstudyTEengineer
2 жыл бұрын
From Nepal.
nice work! send me a mesg on fb need to talk
@technicalstudyTEengineer
3 жыл бұрын
Sure.join on my Facebook facebook.com/santosh.mahaseth.94
Train ajygi hat jao😂
@technicalstudyTEengineer
5 ай бұрын
Underconstruction work
Iss bhaiya ko sahi parts ka naam bhi nahi mallum.
@technicalstudyTEengineer
3 жыл бұрын
Thanks for your suggestions.