Last chopped 300 Series for 2023!
Автокөліктер мен көлік құралдары
We hope you guys enjoy some fresh content of the last vehicle handed over for 2023 and what a beast it was!
This ones featuring the ultimate suite of goodies from our team at Pro Touring HQ. This build is considered to be a stage 3 with extras..
- We've got an 800mm dual cab conversion and chassis extension from the team at Creative.
- Norweld Deluxe Plus Tray with 1900mm Pro Touring Canopy
- Usual ARB bar work in our UV black powder coat
- DPU towing performance package including the sealed air box
- Boss Aluminium RT1 Overlander package roof tent (we've added 300w of solar to the roof)
- A matte clear PPF film over the top of the Glacier White by CoatX
- Full canopy carpet and insulation package
The list goes on...
Any questions regarding this build please drop us a comment below or email us at enquiries@protouringconcepts.com.au
Пікірлер: 11
Dream car
Jelly
Nice 👍
@ProTouringTV
6 ай бұрын
Thanks ✌
Chopped and extended LC 300 series not on 35s. 3.3L V6 turbo is a very powerful engine. It's kinda a waste not to drive it on 37s forget 35s. In my humble opinion. It's illegal in Australia but i would try my level best to register it to legally run 37s on a portal (47 weld). In my humble opinion.
Awesome build. Interesting that you guys are installing DCS batteries. Have any customers cars suffered with the issues of those lithium batteries u der bonnets?
@ProTouringTV
6 ай бұрын
Hey mate we don’t often install them but only based on our previous experience.. we’ve got a few builds out there with a few years under their belts and still going strong
What is a rough cost for something like this?
@ProTouringTV
6 ай бұрын
Expect between 300-320k car inclusive for a build package like this
@justinsmith6769
6 ай бұрын
@@ProTouringTV thanks. From when we put an order in to when we take delivery, how long approx. does it take? I know you can't g/tee Toyota delivery but a rough idea would be great.
@ProTouringTV
6 ай бұрын
On average once we have the vehicle it’s 4/5 months build time. We have great allocations at the moment ✌️