What’s the RPM of lath for the 1” and final boring to desired OD.
@daveprototype6079
2 жыл бұрын
RPM was about 250 for twist drill and 400 rpm for boring bar
@stantherealtor5452 Жыл бұрын
Did it make it easyer to load other bucket into it?
@tomwilhelm67 Жыл бұрын
Would you happen to have a drawing available for this build? Trying to do something similar.
@lesthompson59072 жыл бұрын
how did that thread come out on the 1" 1/2 thread yow was cutting it got cut of before you finish it . les England , ? i wuld love you to sow it in completion.
@daveprototype6079
2 жыл бұрын
I don't believe there were threads in this video. It was a coupler system with retaining pin. Cheers
Пікірлер: 11
Nice quick attach
Measure twice….cut once. That’s precision work!!!😊
So cool!!
Nice job. Great details.
A lot of work but will save time in the long run.
What’s the RPM of lath for the 1” and final boring to desired OD.
@daveprototype6079
2 жыл бұрын
RPM was about 250 for twist drill and 400 rpm for boring bar
Did it make it easyer to load other bucket into it?
Would you happen to have a drawing available for this build? Trying to do something similar.
how did that thread come out on the 1" 1/2 thread yow was cutting it got cut of before you finish it . les England , ? i wuld love you to sow it in completion.
@daveprototype6079
2 жыл бұрын
I don't believe there were threads in this video. It was a coupler system with retaining pin. Cheers