HS2 Bromford Tunnel Portal

You can support me over on
Patreon: / chris_rail_focus
Or by joining KZread: / @rail_focus
alternatively if you'd like to buy me a coffee you can do so on my Ko-Fi page: ko-fi.com/rail_focus
or by making a purchase on my Redbubble photography page: Prints, Mugs, T-shirts and much more:
www.redbubble.com/people/EngP...
Blog: engineeringfocusblog.blogspot...
Twitter: / engfocus
BlueSky: bsky.app/profile/railfocus.bs...
Facebook / engineeringfocus
Instagram: engfocus
The 750m long eastern tunnel portal at Washwood Heath will receive the 2 TBMs, named Mary Ann and Elizabeth which are currently constructed Bromford Tunnel in Birmingham. In this video we take a look at the construction of the portal and tunnel itself.
#HS2 #Birmingham #WestMidlands

Пікірлер: 51

  • @Rail_Focus
    @Rail_FocusАй бұрын

    If you would like to consider supporting the channel click: www.patreon.com/Chris_Rail_Focus or become a Member here on KZread Or you can support the channel by making a purchase on my Redbubble gallery www.redbubble.com/people/engphotography/shop

  • @clivewilkins1754
    @clivewilkins1754Ай бұрын

    Excellent explanation, pitched just right. Well done Sir !

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thank you so much, glad you enjoyed it 🙂

  • @CHRIS-xm1do
    @CHRIS-xm1doАй бұрын

    As a retired construction plant op I love watching these type of videos, although I know all about the methods being used. It brings back many happy memories from my working days.

  • @TrevorWilliams-fq8mg
    @TrevorWilliams-fq8mgАй бұрын

    Good description of the methodology. This is known as top down construction, building the basement upside down. It couldn't be built the traditional way of bottom up because it is too deep to build with a piled retaining wall. A diaphragm wall is the only retaining wall solution there is at that depth but it's much slower and more expensive.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thanks. It's amazing what's involved in excavating a "simple" cutting.

  • @TrevorWilliams-fq8mg

    @TrevorWilliams-fq8mg

    Ай бұрын

    Building the basement the "normal" way would be to build the retaining wall, excavate the basement and pile from the bottom of the basement. But with the depth of the basement the ramp gradient would be too steep to get the piling rig into and out of the basement so the piles are constructed from ground level and progressively cut down as excavation work takes place. This is a much slower way to build but the only way with a 30 metre deep basement.

  • @jermainetrainallen6416
    @jermainetrainallen6416Ай бұрын

    Great vid. Good to see more progress on the Bromford Tunnel. Keep up the good work👍

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thanks, glad you enjoyed it 🙂

  • @MrGreatplum
    @MrGreatplumАй бұрын

    Great video, Chris - really informative and interesting!

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thank you 🙂

  • @Sim0nTrains
    @Sim0nTrainsАй бұрын

    It always impressive how HS2 is being built, great video

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thanks Simon, it is truly impressive.

  • @AndrewG1989
    @AndrewG1989Ай бұрын

    Nice overhead view of what HS2 will look like once it’s completed. Epic video.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thank you 🙂

  • @Daniel-S1
    @Daniel-S1Ай бұрын

    Thanks.

  • @SirKenchalot
    @SirKenchalotАй бұрын

    Great video and some amazing shots in there. Lookinf rowrd to more videos on this topic.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thank you, I'm glad you enjoyed it 😊

  • @markiliff
    @markiliffАй бұрын

    Excellent animated graphic

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Thank you

  • @paulprescott7913
    @paulprescott7913Ай бұрын

    HS2 is an engineering marvel, however its like an electric car. A solution to a problem that doesnt exist.

  • @chris8405

    @chris8405

    Ай бұрын

    Oh the problem exists alright - the UK is suffering from almost a decade and a half of low growth, and many of the cities HS2 will link to have had very low productivity for decades. Reliable and high capacity transport links are vital for the UK to become wealthier. We are pretty rubbish at investing for the future and in time what Sunak did will be recognised as short-termist stupidity, sabotaging the prospects of those yet to join the workforce.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    What a nonsense statement this is.

  • @thorley1969

    @thorley1969

    Ай бұрын

    @@chris8405 pretty much spot on but so many people fail to recognise it.

  • @UK.RoadsCyclingandTransport
    @UK.RoadsCyclingandTransportАй бұрын

    Hopefully this opens in my lifetime (before 2050) jokes aside this is very impressive, fantastic update Chris

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Will definitely be able to travel between Birmingham and Old Oak Common by then 😉

  • @UK.RoadsCyclingandTransport

    @UK.RoadsCyclingandTransport

    Ай бұрын

    @@Rail_Focus 🤞

  • @DavidKnowles0

    @DavidKnowles0

    Ай бұрын

    @@Rail_Focus I suspect you be able to walk through the tunnel to Euston by then, whether trains will be using it is a different story.

  • @ncooper8438
    @ncooper8438Ай бұрын

    Did he say why the tunnel was needed, or did i miss that part?

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Did you not watch the whole video then? To answer your question, no I didn't go into details about why the tunnel is needed.

  • @fantasyfleet
    @fantasyfleetАй бұрын

    It’s videos like this that help highlight why HS2 is so eyewateringly expensive. It’s practically the worlds only under ground high speed railway,

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    [see] Gotthard Base tunnel 🙄

  • @user-wl4cl1ph3b
    @user-wl4cl1ph3bАй бұрын

    Nobody mentions how Tory Donor Construction firms created their OWN Taxpayer funded for profit industry to build this rail project & remember when they asked the Govt for £Billions more in funding & then announced it was being cannibalised due to money shortages FFS !!!

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🙄

  • @John-pp2jr
    @John-pp2jr13 күн бұрын

    2:11 began not begun

  • @Rail_Focus

    @Rail_Focus

    13 күн бұрын

    Bore off

  • @DavidChallis-dj3ek
    @DavidChallis-dj3ekАй бұрын

    Like we need a high speed trip to Birmingham... waste of money that nobody asked for...

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🥱

  • @richardwells4370
    @richardwells4370Ай бұрын

    Totally agree it’s a waste of money, we are broke , , the country cannot afford a pot to piss in , and this vanity project is costing billions, may be three times over budget , as usual , these govt Capitol projects always are ,a lot of individuals are making a killing out this 🤮🤮🤮🤮

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🙄

  • @paulwordsworth9047
    @paulwordsworth9047Ай бұрын

    What a waste a money . Well over budget, the money should have been spent on our railways for improvement s

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🙄

  • @peterjohnson1739

    @peterjohnson1739

    10 күн бұрын

    Paul Wordsworth - Your comment makes no sense. HS2 is the biggest single investment in Britain’s railways in over a century. It will deliver the biggest single improvement to the railway network in our lifetime.

  • @adriancarter825
    @adriancarter825Ай бұрын

    Massive waste of money ever

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🙄

  • @adriancarter825

    @adriancarter825

    Ай бұрын

    @@Rail_Focus it is and wok go down in history as such .

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    🙄

  • @adriancarter825

    @adriancarter825

    Ай бұрын

    @@Rail_Focus it is and definitely will go down in history as the biggest destroyer of ancient woodland , green belt land , country side , farm land etc , AND THE BIGGEST WASTE OF MONEY EVER.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Absolutely nonsense. "Biggest destroyer" is a lie cooked up by HS2 opponents with no basis in reality. See: Scottish wind farm construction, construction of the motorway network and WWII land reclamation.

  • @sirjohng1
    @sirjohng1Ай бұрын

    The Victorians built railways quicker with picks and shovels using PRIVATE CAPITAL. Modern railway construction is paid for by the never ending finance of enslaved TAXPAYERS and, in this case, started at £36 Billion and now, with a large section now cancelled is at £150 Billion and rising. Construction began in 2017, SEVEN YEARS AGO and is still nowhere near finished.

  • @Rail_Focus

    @Rail_Focus

    Ай бұрын

    Many thousands of railway workers also died building the railways. "Victorian" isn't a standard we should aspire to.