How to Install Cubicle Curtain Track - Brite Inc.

www.briteinc.com
Scott Newman, President and CEO of Brite Inc. demonstrates the proper installation of cubicle curtain track.
For more information, or to purchase cubicle curtains or track, please visit our website at www.briteinc.com
Thank you for considering Brite Inc.

Пікірлер: 6

  • @shabbyhijabi4344
    @shabbyhijabi43442 жыл бұрын

    Will the weight of the curtains bend the drop ceiling frame?

  • @MidnightLillyFae
    @MidnightLillyFae6 жыл бұрын

    Thanks!

  • @lennonmj
    @lennonmj11 жыл бұрын

    This may be in fact how most cubicle curtain track is installed; but, it’s not generally the architecturally accepted manner…Most CDs will specify cubicle curtain/IV track shall be mounted onto the surface of the ceiling system with #8 screws, separated by round metal spacers, at points not to exceed 24" OC, to independently supported 2.5" (minimum) 20 ga metal stud suspended from structural framing above with 12 ga vertical hanger wire, capable of supporting 200 lb dynamic load at any point.

  • @tomgreenwood2132

    @tomgreenwood2132

    5 жыл бұрын

    You only need spacers on a tegular ceiling tile.This video lacks too many details. Not an instruction video, just a PR video.

  • @williams5732
    @williams573212 жыл бұрын

    you talk tooo much man

  • @Face_Reality

    @Face_Reality

    2 жыл бұрын

    No he doesn't, you're rude. The video is only 6 minutes long... You're just mad that you can't make a knowledgeable video in a particular skill.