Estimation of Steel for Footing , Beam , Column and Slab by Thumb Rules in Detail
Жүктеу.....
Пікірлер: 27
@MasterCivilEngineering3 жыл бұрын
Good video for engineers❤❤❤
@ShibpadoShib-iz2xf Жыл бұрын
Good video👌
@adil92113 жыл бұрын
Amazing
@hikmatkhan33853 жыл бұрын
Great yar
@assifahamed3142 Жыл бұрын
Thanks for share this video
@punilkumar61763 жыл бұрын
good information
@sayyedofficial.25473 жыл бұрын
👍👍👍
@SUMANDAS-js2kq3 жыл бұрын
Sir aisa hi details video dijiye please ❤️❤️
@faizanalam21243 жыл бұрын
If I am making a BOQ my complete concrete value came of complete one villa more than 300 m3 (slab +beam column +footing +parapet) , so there is any tumb rule for it that how much steel come in one project if we take a ratio of it with concrete
@andrecharles13603 жыл бұрын
Can 8” concrete block be used to build a 4 storey building without using column and beam framework to ewbn The layout each floor is 73’ x 30’.
@SUMANDAS-js2kq3 жыл бұрын
Very nice video
@swedishcl219 Жыл бұрын
How we can find the volume of pouring concrete for Rcc high rise building and gave order for oconcrete from batching ng plant ???
@pebriantonjoko20132 жыл бұрын
is it possible to cantilever with a span of 6 meters using a wide flange with a height of 300 mm and a width of 150 mm
@nallumohana22133 жыл бұрын
Nice
@mamuanahrahsel84863 жыл бұрын
👍👍
@saidouajobe35423 жыл бұрын
are these calculations international standards or base on your country?
@bcategoryphilosophy58596 ай бұрын
if i have all value in cft so what we use ?>
@user-qc5cj8jl9r4 ай бұрын
So how to do this same calculation in feet
@indprajit1590 Жыл бұрын
Which volume wet dry
@narendratella7123 жыл бұрын
How can we find the detail calculation Sir?
@balakesavuluy48128 ай бұрын
Sir in thumb rule steel required for slabs 4kgs to 4.75 kgs per sq feet but as per caluclation 471 kgs per 1 cubic metre so not tallied sir
@bedhprsd19713 жыл бұрын
Sir How many kg steels estimated requirement for 860 sq ft ground floor house including plinth beam, tie beam top beam and slave ? Collumn size: 12/12. Thnks.
@ashishjaiswal80563 жыл бұрын
sir please make a video for latest salary of civil engineer in dubai as per indian experience or how much salary do we expect afte get experience in dubai
@pritamsinghthakur760923 күн бұрын
This thumb rule for minimum kg or maximum kg I want to know what should be the minimum kg and what should be the maximum kg? In every RCC member
@travellVloguk11 ай бұрын
How to calculate 70kg per Cum for plinth beam , plz
Пікірлер: 27
Good video for engineers❤❤❤
Good video👌
Amazing
Great yar
Thanks for share this video
good information
👍👍👍
Sir aisa hi details video dijiye please ❤️❤️
If I am making a BOQ my complete concrete value came of complete one villa more than 300 m3 (slab +beam column +footing +parapet) , so there is any tumb rule for it that how much steel come in one project if we take a ratio of it with concrete
Can 8” concrete block be used to build a 4 storey building without using column and beam framework to ewbn The layout each floor is 73’ x 30’.
Very nice video
How we can find the volume of pouring concrete for Rcc high rise building and gave order for oconcrete from batching ng plant ???
is it possible to cantilever with a span of 6 meters using a wide flange with a height of 300 mm and a width of 150 mm
Nice
👍👍
are these calculations international standards or base on your country?
if i have all value in cft so what we use ?>
So how to do this same calculation in feet
Which volume wet dry
How can we find the detail calculation Sir?
Sir in thumb rule steel required for slabs 4kgs to 4.75 kgs per sq feet but as per caluclation 471 kgs per 1 cubic metre so not tallied sir
Sir How many kg steels estimated requirement for 860 sq ft ground floor house including plinth beam, tie beam top beam and slave ? Collumn size: 12/12. Thnks.
sir please make a video for latest salary of civil engineer in dubai as per indian experience or how much salary do we expect afte get experience in dubai
This thumb rule for minimum kg or maximum kg I want to know what should be the minimum kg and what should be the maximum kg? In every RCC member
How to calculate 70kg per Cum for plinth beam , plz
and so how many pcs of steel is 471 kg sir
Please provide any reference