Crane Rental Minute 7 - Parts of Line

Parts of line for cranes is important to hoisting heavy objects with cranes. In our example we take a Link Belt ATC3275 which has roughly a 22,000 lb line pull per part of line on the first wire rope drum wrap and talk about how many parts of line it will take to hoist 50,000 lbs. This is the video version you can also read the article on our blog - rchrismart.in/21XsTza

Пікірлер: 3

  • @gerryclaffey5737
    @gerryclaffey57376 жыл бұрын

    Very informative thanks I loved your Cat 🐱

  • @droenttrilla
    @droenttrilla7 жыл бұрын

    Mr Martin I have a question if I'm on a job site should I ask what's my heaviest load ? That what I get to the job site with the parts of line already set up ?

  • @503dcccccccccccc
    @503dcccccccccccc3 жыл бұрын

    That’s 2 parts