Building an intermodal train on the BNSF, Seattle, 8-10-2010, part 1

Автокөліктер мен көлік құралдары

A crew brings 5 Dash-9s into Seattle's Stacy Street Yard and begins making up their intermodal train.
First, the Dash-9s are brought off the Champion servicing tracks and into Stacy. Two are left on a track to be used as DPUs. The remaining three engines then grab two separate strings of loaded well cars to form the train.
If you like to watch railroaders doing their jobs up close and personal, you'll like this pair of videos.
5094 / 5378 / 1003 / 967 / 748 - all C44-9Ws
Due to length, this video is in two parts. This is part 1.

Пікірлер: 39

  • @Smoovious
    @Smoovious12 жыл бұрын

    They've been pretty common for years now on intermodal, as well as coal. You'll see them most often in the mountain areas, but just about anywhere you could see them. I've often seen one or two engines in the middle of the consist as well, either together, or in 2 different spots. Helps spread the tractive/braking effort around, particularly where there are a lot of curves.

  • @CSXEMDTrainLover
    @CSXEMDTrainLover8 жыл бұрын

    nice video and great catch of all 5 BNSF engine's making a intermodal train.

  • @davidfrobel7582
    @davidfrobel758211 жыл бұрын

    good video,,as an old truck driver,,mooving trailers around the yard ment for a long boaring day,but it was better than sitting home waiting for a load cross country,,I dont know if rail crews feel the same way,,,,,lol.

  • @SeattleRailFan
    @SeattleRailFan11 жыл бұрын

    Excellent info. I over-simplified things. Probably should have said that the hostler crew "drops off the engines and prepares them so they're ready to go for the next crew that will assemble the train".

  • @SeattleRailFan
    @SeattleRailFan12 жыл бұрын

    @inels100 The "Champion Tracks" are a small 2-track yard where engines are stored. In this case, hostlers brought the engines down from Balmer Yard and dropped them off at the Champion Tracks several hours earlier. At the correct time, the road crew brought the engines out of Champion and into Stacy Yard to make up their train. A train that ends its trip at Stacy could also have the engines moved to the Champion Tracks where the hostlers will pick them up and take them back to Balmer.

  • @Passengervehicles
    @Passengervehicles10 жыл бұрын

    Fantastic videos !

  • @RailfanNoah
    @RailfanNoah10 жыл бұрын

    fantastic video!

  • @Theoriginaltkg2902
    @Theoriginaltkg290211 жыл бұрын

    Nice to see the red and silver warbonnet.

  • @Patriot1776
    @Patriot17769 жыл бұрын

    I think the 'shoving platform' bylaws are now why DPUs are used on the rear-end so much nowadays. Rear DPUs can in a historical sense now be considered 'powered cabooses'. ^^

  • @SeattleRailFan
    @SeattleRailFan11 жыл бұрын

    Air reservoirs. The air compressor fills these and the compressed air is used to power the braking system.

  • @Theoriginaltkg2902
    @Theoriginaltkg290211 жыл бұрын

    Yeah, some roads even use white for main and red for lined over. When I worked for the B&O years ago some switch targets even had different shapes, so if you could not see the color, you at least saw the shape .

  • @ElliottWolcott
    @ElliottWolcott12 жыл бұрын

    cool i love trains.

  • @SeattleRailFan
    @SeattleRailFan11 жыл бұрын

    Here in Seattle, BNSF uses switch flags that use green to indicate the switch is set straight for "mainline movement" and yellow for diverging. In contrast, UP up here uses red switch flags that show red for diverging and turn sideways (i.e.: you don't see them) for mainline movement. I assume it's a local thing. Different railroads do thing differently. May even be differences in different divisions on the same railroad. Different countries will have their own way of doing things.

  • @SeattleRailFan
    @SeattleRailFan13 жыл бұрын

    @hardwork454 I'm not a railroader but from what I've seen it's hard in that you're constantly walking, climbing on cars, setting handbrakes, wrestling with brake hoses, etc. You have to do that in all weather conditions: 95 & sunny or 10 degrees & snowing and everything in between. You have to have a good head on your shoulders as there's lots of rules and procedures to know and follow. And it's not a 9 to 5 job, you'll be working all sort of crazy schedules. More of a lifestyle than a job.

  • @Smoovious
    @Smoovious12 жыл бұрын

    you'll also see them on some local runs if they need to keep a car on the mainline to protect the siding/spur they're shunting on. There are also some loads that require them for extra personnel. Some hazmat, for instance. I've been seeing the railroads do some overdimensional loads too (as a heavy-haul truck driver, I'm against this :) ), that may need a caboose for the additional people if the load requires it. You just won't see them replacing the FREDs tho.

  • @walt1064
    @walt106411 жыл бұрын

    I still like the Warbonnet paint.

  • @Class1aNScaleModelRailroading
    @Class1aNScaleModelRailroading12 жыл бұрын

    I have never seen a DPU on any intermodal train. Interesting.

  • @SeattleRailFan
    @SeattleRailFan13 жыл бұрын

    @micksquizzy I was at maximum zoom in from the start until about 5:00, when I started zooming out to get a wider shot. At 5:18 I was maybe at 1/3 of max, by 6:10 or so the lens was at it widest as the train approached. My camcorder has a 12x zoom (35mm equivalent is 40-480mm).

  • @SeattleRailFan
    @SeattleRailFan12 жыл бұрын

    @MrJimmybgood Zero chance of seeing them regularly on the big Class 1 railroads. The FRED (Flashing Rear End Device) & the cost of the old 5-man crews spelled the end of the caboose. Cabooses are seen occasionally on both Class 1s & shortlines when a job requires shoving cars a long distance. You don't want to have the conductor hanging off the grab irons for 10 miles - very unsafe. In those cases the conductor will ride in a caboose, also called a "shoving platform".

  • @SeattleRailFan
    @SeattleRailFan13 жыл бұрын

    @jpfrench325 Some things are obvious, like a crewman throwing a switch to line the engines onto the correct track. Experience helps with other things. When they left 2 engines on a track I knew from experience those would be used on the rear of the train. I also have a scanner, so I was listening to the crew talk amongst themselves on the radio.

  • @SeattleRailFan
    @SeattleRailFan11 жыл бұрын

    Don't think I've yet got an engineer to sound his horn just to acknowledge me. I have got two or three to give a wave, which is nice...

  • @UPMAN2011
    @UPMAN201112 жыл бұрын

    Yes according the bylaws they must have shoving platform while moving a train in reverse.

  • @attlevi
    @attlevi11 жыл бұрын

    Great Video. Thanks for sharing. Im in S. Florida. We nver see anything on this end. I too, Like the War Bonnet Paint Scheme. I the BNSF should keep them in addition to the the pumpkins. Funny, about the sounds.be. read my comments & You will see. I love the sounds they make. But CSX keeps running a shtload of Dash 8. We rarely get a GEVO this far South.

  • @phoenixrailfan7956
    @phoenixrailfan79568 жыл бұрын

    Nice pop off at 0:24

  • @MrJimmybgood
    @MrJimmybgood11 жыл бұрын

    hi all rail fans. could anyone tell me what are those two small tanks next to the fuel tanks are what are they used for. thank you for sharing.

  • @hardwork454
    @hardwork45413 жыл бұрын

    Great videos, im starting at kcs in a bout a week as a conductor trainee and wanted to know what you think of the job like is it hard or just hard if you don't like to work, im looking forward to starting my career cause im 18 and just graduated and see this as a great thing.

  • @SamWalworth
    @SamWalworth11 жыл бұрын

    Just wondering why does the "switch flag" shows "Yellow' even when the danger of derailment is 100% if the locomotive goes by it? Other countries (e.g. Indian Railways) i see it as Red whenever there is a switch like this is involved

  • @jonnhanlan930
    @jonnhanlan9308 жыл бұрын

    What you are calling a foreman is called a conductor in Canada (CN,CP, etc.)

  • @SeattleRailFan

    @SeattleRailFan

    8 жыл бұрын

    +Jonn Hanlan I've noticed on local jobs the term "foreman" is used on the radio, on road trains they use the term "conductor". Might just be that BNSF has a certain way they like to do things.

  • @jpfrench325
    @jpfrench32513 жыл бұрын

    How do you know what those people are doing as well as whats happening?

  • @inels100
    @inels10012 жыл бұрын

    what is a Champion Track?

  • @MrJimmybgood
    @MrJimmybgood12 жыл бұрын

    HELLO ALL I DONT KNOW IF ITS TRUE BUT I HAVE HERD THAT THE CABOOSE WILL MAKE A COME BACK IS THIS TRUE. THANK YOU FOR ANY IMFO ON THIS SUBJECT. A FAN.

  • @curtis13450
    @curtis1345010 жыл бұрын

    run it

  • @scudrunner79
    @scudrunner7910 жыл бұрын

    Two words. Hand signs.

  • @adamkrajewski5040

    @adamkrajewski5040

    9 жыл бұрын

    Brad Thomas for what? Engineer on point.

  • @lrcopeland09
    @lrcopeland0911 жыл бұрын

    I filmed 748 today. I will respond with the video.

  • @charlesdell2864
    @charlesdell28649 жыл бұрын

    Boring for some, fastinating for others, all depends on who you are.

  • @bryanwhitford2729
    @bryanwhitford27298 жыл бұрын

    So disappointed to see a Warbonnet on point. Ugly engine lol

Келесі