A HCMT train arriving and departing Oakleigh Station on the Cranbourne and Pakenham lines.

This is Oakleigh Station.

Пікірлер: 2

  • @thelionking219
    @thelionking21910 сағат бұрын

    On the Hurstbridge Line as of 2018, the level crossing at Grange Road, Alphington was removed by lowering the rail corridor beneath the road into a rail trench, which also included track duplication between Heidelberg and Rosanna and the level crossing removal at Lower Plenty Road, Rosanna by building a skyrail with a new elevated Rosanna Station. And as of 2023, the Hurstbridge Line Duplication was completed which included around 3 kms of duplicated tracks between Greensborough and Eltham and around 1.5 kms between Diamond Creek and Wattle Glen. Around 4.5 kms of track duplication in total between Greensborough and Hurstbridge. Greensborough and Montmorency stations got completely rebuilt and Diamond Creek Station got upgraded. Then, as of 2027, the level crossing at Ruthven Street, Macleod was removed by building a skyrail over the road. And then, as of 2028, the rail tunnel under Greensborough Highway was extended a few hundred metres longer and a new multi-deck car park was built at Watsonia Station as part of the North East Link.

  • @thelionking219
    @thelionking21910 сағат бұрын

    As of 2025, The Metro Tunnel was completed which included a 9 km rail tunnel between South Kensington and South Yarra, 5 new underground stations at Arden, Parkville, State Library, Town Hall and Anzac and it has the Sunbury, Cranbourne and Pakenham lines running through it. Also it has direct airport connection via the Melbourne Airport Rail Link which was completed in 2029 and included an upgraded Sunshine Station with a new regional platform and a new transport superhub, a rebuilt Albion Station on ground level on the Sunbury Line, a new Keilor East Station on ground level and a new elevated Melbourne Airport Station on skyrail. And as of 2043, the Suburban Rail Loop was completed which is a 90 km rail line from Cheltenham to Werribee via Melbourne Airport and 60 kms of it from Cheltenham to Melbourne Airport was built underground with 13 new underground stations at Cheltenham, Clayton, Monash, Glen Waverley, Burwood, Box Hill, Doncaster, Heidelberg, Bundoora, Reservoir, Fawkner, Broadmeadows and Melbourne Airport, 2 new transport superhubs at Clayton and Broadmeadows and SRL driverless trains.