24' x 24' Garage Build - Footing dig & monolithic slab pour

Тәжірибелік нұсқаулар және стиль

24' x 24' Garage Build Part 1 - Here I dig the footing, build the forms for our concrete, laid and bent the rebar, and poured the monolithic slab.

Пікірлер: 74

  • @ronburgundy6760
    @ronburgundy67603 ай бұрын

    You lost me when I saw a dump truck full of concrete. 😂

  • @benjigray8690
    @benjigray869013 күн бұрын

    Thank you for making this video about the preparation and pour of a mono slab. When you said that the last batch of concrete seemed to be different to the previous ones, and there was a lot of bleed water, I was thinking that mayhaps the folks at the batching plant mightn't have put as many kilos of cement per cubic metre or possibly, not as much plasticiser in that last batch. For me, I think excessive bleed water translates to "internal segregation" of the components of the concrete, lack of homogeneity. Apart from that bit of "constructive criticism", I think that you , and your crew did a great job.

  • @jjtrades7186
    @jjtrades71862 ай бұрын

    Bro did a 3ft foundation. That garage will withstand a direct nuclear explosion lol

  • @georgeballow7028
    @georgeballow70282 ай бұрын

    Contractor poured slab for my addition in 0F temperature. I asked if he was crazy - this is the coldest day in years. Assured me it would be fine. 25 years later not a crack.

  • @Bradini267
    @Bradini2676 ай бұрын

    awesome job looking forward to the garage build

  • @srmcontracting

    @srmcontracting

    6 ай бұрын

    Thank you, that video should be up in a couple days.

  • @tracymankey9314
    @tracymankey9314Ай бұрын

    Amazing job ❤

  • @jonathanstabley309
    @jonathanstabley3092 ай бұрын

    Really nice job digging those footings, and forming. I’ve done monolithic pours on smaller jobs like sheds, but never one that big. Great job!

  • @srmcontracting

    @srmcontracting

    2 ай бұрын

    Thanks 👍

  • @Abidsalehuk
    @Abidsalehuk5 ай бұрын

    Great work and looking forward to see more videos.

  • @srmcontracting

    @srmcontracting

    5 ай бұрын

    Thank you!

  • @josephrottina1901
    @josephrottina19016 ай бұрын

    Good luck brother .👍🏻🇺🇸🇺🇸🇺🇸🇺🇸

  • @jacobbelfield9835
    @jacobbelfield98356 ай бұрын

    One thing I do if I hit a rock screwing up my trench is after pulling the stone out, I toss some of the backfill back in and drag the flat side of the bucket to keep it flat. Then I go back over (just one pass) with jumping jack and this helps me sleep at night. But idk anything about keeping concrete in shape.. I build walls on 3/4”

  • @srmcontracting

    @srmcontracting

    6 ай бұрын

    Thanks for the tip, I need to invest in a jumping jack.

  • @johnm7554
    @johnm75546 ай бұрын

    That concrete will last forever

  • @user-vr8gd7eq9s
    @user-vr8gd7eq9s4 ай бұрын

    Wow! 22k ! lost all my channels when I went premium …glad to find you again and nice garage!

  • @danielcolby7293
    @danielcolby72936 ай бұрын

    20k subs, nice! Maybe do the ramp now…via the dump truck…probably won’t regret it lateron ✌️

  • @johnmorella3100
    @johnmorella31003 ай бұрын

    Great job! What did the two concrete mixer trucks cost you with delivery?

  • @AlexeiTetenov
    @AlexeiTetenov5 ай бұрын

    I'm surprised that you did not put down insulation underneath slab and along the edges to minimize any heat loss.

  • @ChaseSmallCraft
    @ChaseSmallCraft23 күн бұрын

    Do you think the footing with slab on top is better then the thickened edge approach? How deep did you go?

  • @la8309
    @la83093 ай бұрын

    nice work how much does something like this cost?

  • @scottjackson638
    @scottjackson6386 ай бұрын

    Great video. Can you explain why plastic is not installed under the beams arounder the perimeter of the foundation? Isn't moisture a problem there too?

  • @srmcontracting

    @srmcontracting

    6 ай бұрын

    Thank you, I'm no concrete expert but I believe the moisture is more of an issue for the slab and not the footings.

  • @scottjackson638

    @scottjackson638

    5 ай бұрын

    @@srmcontracting But the beams around the perimeter are also concrete, which are also subject to moisture wicking up from the soil. In fact, since moisture is most likely to accumulate around the perimeter of the slab from rain and roof runoff, I think moisture is the biggest concern in the area where there is no plastic installed.

  • @mbrain03
    @mbrain032 ай бұрын

    Good Job, I had the concrete calculated at 22 yards assuming your trenches were 12 inches wide

  • @srmcontracting

    @srmcontracting

    2 ай бұрын

    There was a lot of over dig because of the rocky soil and that's what threw it off.

  • @outfitr9703
    @outfitr9703Ай бұрын

    Set and poured a LOT of monos, never seen one done like that before. Yikes.

  • @Bobtrain007
    @Bobtrain00719 күн бұрын

    Very rough finish, why not pay a couple of finishers? That floor will be hard to clear when oil is spilled on it.

  • @bryanthomas544
    @bryanthomas5446 ай бұрын

    Nice work man I been following for a while. What are your short load fees around there?

  • @srmcontracting

    @srmcontracting

    6 ай бұрын

    Thank you, it's about $400 no matter how many yards you get.

  • @metalrooves3651
    @metalrooves36514 ай бұрын

    that wide footing COST A FORTUNE! !UNREAL ...why wouldn't you use a 6 inch trencher ORlay up a cheap block wall?? WE overkill everything today because everybody is rich......

  • @umminkug

    @umminkug

    4 ай бұрын

    It's the stupid code. Unreasonable overkill fits all local building code.

  • @dlk3474
    @dlk34745 ай бұрын

    Why didn’t you vibrate itv

  • @christiemambourg3615
    @christiemambourg3615Ай бұрын

    How much to build total with high costs of building materials here in Florida. I need an ADU built how much total

  • @srmcontracting

    @srmcontracting

    Ай бұрын

    The whole garage build was about 22k but if your in FL you won't need a slab like this. You should be under 20k for sure. Also a pole barn might be a good option to look into.

  • @happydayz5321
    @happydayz53215 күн бұрын

    How come no wall hold down bolts on the perimeter ?

  • @flipthadon4276
    @flipthadon42763 ай бұрын

    How many yards of concrete did you use?

  • @srmcontracting

    @srmcontracting

    3 ай бұрын

    It ended up being 28

  • @khodges2
    @khodges23 ай бұрын

    FYI it’s Cubic Yards

  • @jamescole3152
    @jamescole31526 ай бұрын

    How many days did you spray the slab?

  • @srmcontracting

    @srmcontracting

    6 ай бұрын

    3 days, after that the temps started dropping so I just left it covered up for about 10 days.

  • @Raffaelo08
    @Raffaelo08Ай бұрын

    He used rocks to support the rebar. 😮 Is that Allowed?

  • @srmcontracting

    @srmcontracting

    Ай бұрын

    Yes

  • @edisonpaci9922
    @edisonpaci99225 ай бұрын

    Man just order 3 trucks

  • @user-yi6ug2cq3f
    @user-yi6ug2cq3f5 ай бұрын

    Столько сделали, но плохо что выбиратором не прошли

  • @bagsjr1
    @bagsjr12 ай бұрын

    what happens if no vapor barrier?

  • @srmcontracting

    @srmcontracting

    Ай бұрын

    I did plan to put it but I forgot. It's not code for an out building and the building doesn't have HVAC so it's not a big deal.

  • @jamescole3152
    @jamescole31526 ай бұрын

    That was some thin plastic.

  • @DarthMeheelos
    @DarthMeheelos4 ай бұрын

    норм

  • @Mr.SuperDuper-idk
    @Mr.SuperDuper-idk2 ай бұрын

    Dump truck 🛻 with concrete. NEXT 😂😂😂

  • @WillByrd-ff9pp
    @WillByrd-ff9pp5 ай бұрын

    I got quoted 8500 does that sound correct

  • @srmcontracting

    @srmcontracting

    5 ай бұрын

    That sounds reasonable, materials alone are 5-6k

  • @fabiancanada8876

    @fabiancanada8876

    5 ай бұрын

    I would also guess that the materials are about 6k total. Then you add the exavator and labor for another 2k you end up at around 8000. So I would say 8500 CAD is on the higher end but still ok.

  • @Mario.alsanchez117
    @Mario.alsanchez1175 ай бұрын

    🍔 🍔 🍔

  • @juiceplanet147
    @juiceplanet1476 ай бұрын

    You have to invest in a tripod. Your videos are too short for this genre. Record 3 or 4 hours with sound of machines than edit down to 1 hour. Mix in a little voice over just context. Mute curse words if any. Great for educational purposes & business. Most important, place your business info at the bottom on the video screen. Watermark style. Give free business tees to best comments related to the video. Will help your retention rate and algorithm. Make sure your business info is on them. Cheap investment great for advertisement purposes. #construction #education #machine #building #garage #srmcontracting

  • @staceymccloud6

    @staceymccloud6

    6 ай бұрын

    I like bro !!!

  • @salvadorreynoso7809
    @salvadorreynoso78092 ай бұрын

    awesome job, do it once do it right so you don't have to do it again , pay no attention to the nay sayers/know it all

  • @tysonmayberry1208
    @tysonmayberry1208Ай бұрын

    pretty sad not to know EXACTLY how much concrete you need

  • @mikew7561

    @mikew7561

    Ай бұрын

    Yeah especially 4 yards short

  • @srmcontracting

    @srmcontracting

    Ай бұрын

    The over dig and the rocky soil threw it off big time

  • @dominicchristadore9414
    @dominicchristadore94145 ай бұрын

    A five dollar ground strap cost you over $1000. I think what you need to do is stick to your concrete business neither that or take a few courses on truck and vehicle repair.

  • @-mejor-que-nostradamus-6152
    @-mejor-que-nostradamus-61522 ай бұрын

    99% Of People Wrong Watering Concrete Every Day After Pouring New Slab. Amén.

  • @kubota33
    @kubota336 ай бұрын

    He is doing just fine. Do better yourself before telling people how to do things

  • @billwatcher9321
    @billwatcher9321Ай бұрын

    Why on earth would you dig a footing 36 inches?? Huge waste of time and materials.

  • @Ayeote99

    @Ayeote99

    9 күн бұрын

    I'm thinking it must be way up north with ground frost/heave issues.

  • @ragingrevenge1

    @ragingrevenge1

    8 күн бұрын

    Did you look at the plans? Maybe that is what is required, or maybe the owner plans a future second floor.

  • @blake343

    @blake343

    6 күн бұрын

    Frostline is 48 inches up here in canada

  • @takenserious4554
    @takenserious45545 күн бұрын

    I don't understand why you'd even make a 24 x 24 garage. Do you know what the dimensions of modern vehicles are?

  • @mr.ndirangumwaura9936
    @mr.ndirangumwaura99362 ай бұрын

    American foundation work is illegal in most other countries. What a joke

  • @mrcupcakeman32

    @mrcupcakeman32

    25 күн бұрын

    why is that?

  • @billwatcher9321
    @billwatcher9321Ай бұрын

    Obviously an unlicensed contractor. He doesn't know the building code / doesn't have a clue how deep footings are to be set. And the concrete companies in the area refuse to deliver to him.

  • @srmcontracting

    @srmcontracting

    Ай бұрын

    Put down the pipe...

  • @juanvasquez2982
    @juanvasquez29825 ай бұрын

    Some buddy missed the numbers 4 yards