DrawWorks LP

DrawWorks LP

Hello, Welcome to Drawworkslp KZread page. We are an oil tool manufacturer and service company specializing in Casing fillup, circulation and flowback tools.

DWCRT

DWCRT

DPC™

DPC™

AutoFill Animation

AutoFill Animation

WODPC™ Enventure

WODPC™ Enventure

DPC Features & Benefits

DPC Features & Benefits

DPC Animation

DPC Animation

SJC Instuctional Video

SJC Instuctional Video

Пікірлер

  • @gusmullins3805
    @gusmullins38055 жыл бұрын

    A new innovative sealing 500 ton casing elevator. Our engineering staff using the latest in computer simulation have developed this NEW PATENTED TECHNOLOGY.

  • @ganon602
    @ganon6026 жыл бұрын

    Hmmmm..... Seems familiar....

  • @manuelnoriega3672
    @manuelnoriega36726 жыл бұрын

    We need the video of how to arm and disarm please. Thank you Mail: [email protected]

  • @leonhorst2269
    @leonhorst22698 жыл бұрын

    I understand that you are running cement down the casing / wellbore before completion of casing. Is there any plug at the end of the first casing run down the wellbore? Otherwise the cement would gather at the bottom making it difficult to run the casing all the way down to the bottom, correct?

  • @Drawworkslp
    @Drawworkslp8 жыл бұрын

    Yes Leon, Are customers do cement as well as control mud with our AutoFill.

  • @leonhorst2269
    @leonhorst22698 жыл бұрын

    +Drawworkslp I understand but I asked myself when you're customer runs the casing down - why would they not run the casing first and cement second rather than displayed in your video where they cement into the pipe while running it down at the same time? Secondly, I was wondering when you flush the wellbore with mud to balance formation pressure - how to run the casing in without releasing the mud from wellbore. I mean what's the measure between drilling and casing running that prevents the wellbore from collapsing?