TAM International

TAM International

TAM International, Inc., is an independent oilfield services company headquartered in Houston, Texas, with subsidiary offices in Aberdeen, Scotland; Perth, Australia; Calgary, Canada; Bogota, Colombia; and Dubai, UAE. TAM inflatable packers, swellable packers, and downhole products and services, are available worldwide from offices in North America, Europe, the Middle East, Latin America, Asia Pacific, and Africa.

Section Milling

Section Milling

Thru Tubing Cement Squeeze

Thru Tubing Cement Squeeze

PosiFrac™ Straddle System

PosiFrac™ Straddle System

SlikPak™

SlikPak™

Plug & Retainer Kit (English)

Plug & Retainer Kit (English)

Plug & Retainer Kit (Spanish)

Plug & Retainer Kit (Spanish)

Пікірлер

  • @user-zq3iz3zn5m
    @user-zq3iz3zn5m3 ай бұрын

    In a horizontal application, does the mud pooling on the low side of the well bore affect production.

  • @MohamedMohamed-xx1zq
    @MohamedMohamed-xx1zq6 ай бұрын

    Is that open hole cement retainer os drillable

  • @maddavisdog07
    @maddavisdog07 Жыл бұрын

    Zion oil and. Gas's disgrunteled share holders brought me here.

  • @fyougauges
    @fyougauges2 жыл бұрын

    Thanks for your sharing, Excellent Video.

  • @ryanb1874
    @ryanb18742 жыл бұрын

    Isn't it a joy to see that they all copy Baski, yet, his house is left to him, desolate.... interesting.

  • @alaataeb870
    @alaataeb8705 жыл бұрын

    ما هي الاسباب التي تدفعنا لاستخدام multy stage cementing

  • @mohamedhamedyassin2695
    @mohamedhamedyassin26954 жыл бұрын

    لو وزن عمود ال CMT أعلى بكتير من ال fracture pressure of Formation وهيكسرها بنضطر نعملها على مرحلتين عشان نقلل ال CMT Hydrostatic Head بدل ما يبقى مرة واحدة ويكسر بنعمل مرة ونسيبه ي thicken وبعدين مرة تانية بعده

  • @alaataeb870
    @alaataeb8704 жыл бұрын

    @@mohamedhamedyassin2695 شكرا اخي تسلم عالشرح

  • @mohamedhamedyassin2695
    @mohamedhamedyassin26954 жыл бұрын

    @@alaataeb870 العفو يا فندم تحت امرك

  • @djoninavarino9385
    @djoninavarino93856 жыл бұрын

    Ok🔜🔜🔜

  • @kellihollinger7715
    @kellihollinger771510 жыл бұрын

    I don't understand the need for a multistage cement job.

  • @Zgriffinable
    @Zgriffinable10 жыл бұрын

    Say your first cement rises in the annulus to a lost circulation zone so above this zone of loss, you'd have no cement. With this tool run ahead of time and above this zone of loss, you can open the port collar and pump cement into the annulus. Now you've succeeded in placing cement above a zone of loss. This is just one example of a need for a two stage cement job.

  • @kellihollinger7715
    @kellihollinger771510 жыл бұрын

    John Griffin Thanks for that explanation. That makes sense.

  • @finalio
    @finalio9 жыл бұрын

    Kelli Hollinger In addition , if the hydrostatic column is too long and a bottom formation can not handle that pressure, you didide the CMT into stages. You could use multistage cementing to contraol any mud contamination

  • @dantorini63
    @dantorini63 Жыл бұрын

    Hydrostatic and ECD effects makes it impossible to place cement ar desired length in annulus without losses. Another advantage is that in certain cases you do not have to wait for fist stage cement to set before pumping the second

  • @rubbercompounding06
    @rubbercompounding0610 жыл бұрын

    Working Process Really Mind blowing