What to expect for the 10 Days of activity?
Day 1:
- Lay protection on the floor and provide vertical wall plastic protection before the hacking work starts
- Dismantling of existing bathroom/toilet accessories and wiring
- Hacking of existing wall and floor tiles in bathroom/toilet and removal of paint
- Installation of portable toilet at the end of the day
Day 2:
- Repairing of spalling concrete (if any)
- Replacement of the floor trap and basin piping at bathroom/toilet
- Level peg for toilet/bathroom wall
- Rewiring for non-compliance water heater (if any)
Day 3:
- Skimming to common/master bedroom toilet ceiling
- Chamfering to side wall and pipe followed by 300mm upturn with waterproofing screed
- Dismantling and replacement of aluminium louvre vent at bathroom/toilet (am)
- Application of a layer of non-shrink grout in bathroom/toilet floors (pm)
- Repairing of spalling concrete (if any)
Day 4:
- Application of waterproofing membrane (2 coats) to bathroom/toilet floors
- Application of a layer of non-shrink grout in bathroom/toilet floors (pm)
Day 5:
- Conduct 1st water test to bathroom/toilet (4 hours)
- Screeding to bathroom/toilet floors
- Replacement of refuse chute hopper (if any)
Day 6:
- Plastering work to toilet/bathroom wall
- Painting to toilet ceiling
Day 7:
- Wall tiling work to common toilet and master bedroom toilet walls
Day 8:
- Floor tiling work to common toilet and master bedroom toilet walls
- Measurement of bi-fold aluminium door
- Replacement of main entrance gate and handling over of keys to resident upon completion (if any)
Day 9:
- Installation of pedestal pan, sanitary pipes, wash basin, grab bar and toilet door
- Installation of EASE grab bar and ramps inside unit (if any)
- Replacement of main entrance door, painting of existing main door frame and handling over of keys to resident upon completion (if any)
- Reinstatement of existing fixtures to bathroom/toilet and painting to bathroom/toilet ceiling pipes
- Defects rectification works (if any)
- Removal of portable toilet
- Painting work to toilet ceiling and pipe
Day 10:
- Conduct 2nd water test to bathroom/toilet (4 hours)
- Application of EASE slip-resistant treatment (if any)
- Touch up painting
- Cleaning and housekeeping
- Handover to resident

Пікірлер: 50

  • @ja_brut
    @ja_brut Жыл бұрын

    thank you for this video..

  • @andytanwh
    @andytanwh

    thanks for sharing. my area going to do HIP. doing some research, headache 😅

  • @busloxwcko7randy
    @busloxwcko7randy Жыл бұрын

    Ya my house also undergoing Home Improvement Programme too (HIP)!

  • @mlu8395
    @mlu8395

    My fat was HIP 5 years ago. But the toilet bowls are worse than my previous original HDB provided " American standard" toilet bowl which had good flush and was easy to clean. Good for elderly maintenance.

  • @simplelifesg3459
    @simplelifesg3459

    Thanks for the video. Can I find out how long after polling did you get the letter that HIP would start in one month?

  • @jefflim7020
    @jefflim7020

    Hello @jesgbc, I'm staying at a place that's currently rented with few other tenants, the landlord doesn't stay in it. Our blk HIP is estimated to start in about 4-6 months.

  • @zdiscusy
    @zdiscusy

    Thanks for sharing, its so helpful. My block polling end of Sep. I notice you have a mobile toilet installed. Is it stinky? Can shower in there?

  • @yipeeyeay0
    @yipeeyeay0

    Hi! Thanks for sharing this video! My block is the last one in the same area works starting soon 😅 can I know if the water taps below the shower head and below the sink were provided by them?

  • @CutieRingoJoy
    @CutieRingoJoy

    Where you brought the drop sheets from

  • @heathphoenix1612
    @heathphoenix1612 Жыл бұрын

    Since its an apartment can the individual house members start using their toilets and rooms after 10days of work in their house or should wait for every flat and individual house in the apartment to be completed

  • @stevencsk79
    @stevencsk79 Жыл бұрын

    Did the workers try to upsell you their extra tiling and painting service? :D

  • @luvrascal4561
    @luvrascal4561 Жыл бұрын

    How was the dust and cleaning up thereafter?

  • @tuinabao4608
    @tuinabao4608

    For the mobile toilet , how often they clear the waste? 😅

  • @CutieRingoJoy
    @CutieRingoJoy

    Can i ask after covering how do I get water from the kitchen sink 😅since both my toilet under toilet upgrade also and kitchen will be too dusty to collect the water from there, we want drink coffee

  • @CutieRingoJoy
    @CutieRingoJoy

    Lmao I might as while bring my whole bag and clothes and soap and camp in the rest area and shower and peepee and poopoo downstairs cause upstairs too dusty and noisy.

  • @wendycho2518
    @wendycho2518 Жыл бұрын

    Where did you all sleep?

  • @chinng3404
    @chinng340421 күн бұрын

    Must everyone do toilet?

  • @Indr_Znl
    @Indr_Znl

    Mine starts today. 😣

Келесі