Thai House Build Week 11 - Walls & Roof go up

Тәжірибелік нұсқаулар және стиль

Week 11 of our Thai house build saw the block work for walls begin along with the start of the roofing system. Both teams are working alongside each other on site. Week 10 was a week off for the builders while the column concrete cured for 7 days. Good progress is being made, in between rain showers.

Пікірлер: 2

  • @rimzalia1362
    @rimzalia1362Ай бұрын

    Ensure your contractor install wire mesh where concrete meet AAC blocks. It avoids surface wall crack in the future

  • @mabamabam
    @mabamabamАй бұрын

    Interesting. Its like a standard south asian post and beam but updated a bit with the concrete slab, steel roof, and AAC.