Stages Before the Track is Fully Ready for Normal Speed Traversal

Автокөліктер мен көлік құралдары

Ballast stones, also known as track ballast, are used along railway tracks to absorb vibrations from passing trains.
Track laying is the process of installing railway tracks. This project involves upgrading the railway line between Jember and Banyuwangi by replacing the rails and their sleepers to enhance the safety, stability, comfort, and speed of the trains that run on the track.
After the ballast stones are spread along the track, the next stage involves maintenance using specialized equipment: the Plasser Ballast Regulator (PBR) and the Multi Tie Tamper (MTT). The PBR is used to level the ballast in the center and on the right and left sides of the railway track, while the MTT compacts the ballast beneath the sleepers.
| Camera : GoPro Hero 10, Nikon P1000
| Location : Track between Arjasa-Kotok Km 204+9
| Video Date : July 6th, 2024
Table of Contents:
0:00 Pandanwangi Train
1:00 MTT Starts Work
5:45 PBR Starts Work
11:05 Work Results
11:33 Outro
#ptkai #keretaapi #keretaapiindonesia #railfans
Subscribe here ( / @aayusuf7191 )

Пікірлер: 8

  • @lilissupriatin9823
    @lilissupriatin982325 күн бұрын

    Masya Allah Aa Yusuf barokallahufiikum.. Semoga Sehat selalu..

  • @kinzaalmurabbi-gk4df
    @kinzaalmurabbi-gk4df16 күн бұрын

    🔥

  • @tripstory_id
    @tripstory_id26 күн бұрын

    Persiapan menuju relasi jakarta - banyuwangi langsung tanpa transit. Semoga beneran terwujud 😁👍

  • @aayusuf7191

    @aayusuf7191

    26 күн бұрын

    Amin.

  • @fathankece
    @fathankece29 күн бұрын

    Mas diperkirakan berapa bulan/hari lagi sepenuhnya selesai?

  • @aayusuf7191

    @aayusuf7191

    29 күн бұрын

    Wah mohon maaf, belum tau ya.

  • @Kaarbaa
    @KaarbaaАй бұрын

    desa apa ini kak?

  • @aayusuf7191

    @aayusuf7191

    Ай бұрын

    @@Kaarbaa Desa Bedadung.

Келесі