In this video, detailed discussion of #Slab #Checklist #before #casting or #Slab #Reinforcement #Live #Checking Or #10 #things #You #must #check #before #casting has been done with its significance, which will be useful for aspirants of UPSC ESE/GATE/PSU's/SSC-JE /State PSC JE/AE exams and Quality Control Engineer on Site.
Following content has been discussed in this video:-
#Slab #Checklist #before #casting or #Slab #Reinforcement #Live #Checking Or #10 #things #You #must #check #before #casting.
Note:-
1. #Lap #length or #development #length = 47*d
where, d= dia. of reinforcement bar.
2. #Anchorage #length for #crank #bar = 13*d or 0.75* effective depth of beam.
@ beam column junction, Anchorage is 50*d at internal side & 60*d at external side.
3. #Location of #bent #up #bar from #support is equals to √2 jd
where, j= #lever #arm #factor
d= effective depth of member.
4. #Chairs are provided in #double #mesh #reinforcement @ 1-1.5 sq. meter area & 1000 mm to 1500 mm spacing. Diameter of chair shall be more than diameter of reinforcement used in slab. length of chair shall not be less than 800 mm. leg of chair is generally provided as 300 mm.
5. #Cost of a bag (300 nos.) of #cover #blocks is approx. Rs. 200/-. spacing of cover blocks is generally 600 mm to 1000 mm.
6. #Mullion #column is generally 1.2 meter high & provided in #parapet #walls.
7. #Quantity of #concrete is calculated as :-
1.54*(L*B*H)
it is also noted that from above quantity 2% deduction shall be there for reinforcement.
1.54 factor is only used to calculate quantity of aggregates, sand & cement.
8. #Hooks of #stirrups are generally provided @ 45° or 135° angle.
9. 12 mm #ply is generally used as #shuttering elements.
10. For a 600 mm * 600 mm member/column, 2 shuttering ply shall be of 576 mm width & remaining 2 shuttering ply shall be of 600 mm width.
11. Green concrete or hardened concrete is same thing.
Subscribe my you tube channel @Civil Engineering Tutorials by Yogesh Kaushik Sir for further updates / @civilengg.byyogeshkau...
Video Link of MDD & OMC of Soil using Modified Proctor test:-
• MDD & OMC OF SOIL I MA...
Video Link of Calibration of Pouring Cylinder, Cone Weight of Sand & Bulk Density of Sand:-
• CALIBRATION OF POURING...
Video Link of Water Absorption of Track Ballast:-
• WATER ABSORPTION TEST ...

Пікірлер: 6

  • @pmcsonipatrvnl6968
    @pmcsonipatrvnl69682 жыл бұрын

    nice sir ji

  • @sohrabansari9309
    @sohrabansari93092 жыл бұрын

    Thank you sir ji

  • @mdzeya9351
    @mdzeya93512 жыл бұрын

    👍🎉🤲👌

  • @shub0
    @shub08 ай бұрын

    Sir aap lap Length 47 dia bol rhe hai, But min. Lap length is Max. Of two 200mm Or 15 diameter Please explain.

  • @mukeshkumarsharma8741
    @mukeshkumarsharma87412 жыл бұрын

    Bad workmanship in steel fixing .

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    2 жыл бұрын

    Hmm Will keep in mind these type of mistakes for upcoming videos Sorrybdear

Келесі