Part 5 - Rural Water Supply Drill - Catawba County, North Carolina - May 2023

In this first clip from the fill site we see operations as the first tanker arrives at the fire hydrant and prepares to self-load. No pumper was yet available so the crew had to use the available pressure in the fire hydrant to overcome hose/fill line friction. A pumper eventually became available and was used to load tankers; but only after the pumper was first connected to the fire hydrant. The fill times were cut in half if not more in most cases once the pumper was used.

Пікірлер