Metode Static Axial Load Test Bored Pile

Автокөліктер мен көлік құралдары

Metode Static Axial Test Pondasi Bored Pile Oleh PT Tiga Pilar Engineering, Uji Beban Loading Test Pondasi Bored Pile ini Menggunakan 2 Unit Excavator Untuk Install Baja H Beam dengan Durasi Pelaksanaan 30 Jam.
#boredpile #excavator #loadingtest

Пікірлер: 9

  • @TEMELTASCONSTRUCTION
    @TEMELTASCONSTRUCTION3 жыл бұрын

    good work

  • @bagusadiprayoga6616
    @bagusadiprayoga6616 Жыл бұрын

    Berapa ton tu mo

  • @mascemal2196
    @mascemal21963 жыл бұрын

    Alhamdulillah aku ws tau weruh bore pile diameter 3 meter 😁

  • @KerjaDolan

    @KerjaDolan

    3 жыл бұрын

    Mantap

  • @gusartampubolon7122

    @gusartampubolon7122

    2 жыл бұрын

    @@KerjaDolan Halo Pak Dolan.... By the way, bisa tidak saya mendapatkan data Loading Test yang pernah Bapak laksanakan? Perlu untuk bahan perkuliahan. Terima kasih.🙏🙏

  • @FahrenheitSumbayak
    @FahrenheitSumbayak2 жыл бұрын

    zin bertanya bang. Apa perbedaan PDA Test dibandingkan Loading Test?? digunakan saat kapan? bagusan test yg mana?

  • @KerjaDolan

    @KerjaDolan

    2 жыл бұрын

    Bedanya pada jenis Peralatan, Pelaksanaan, Metode, Biaya dan Durasinya. PDA Hasil Cepat, Loadtest Hasil rata rata bisa di ketahui dalam tempo 30 jam. PDA sering di gunakan utk lokasi Lokasi yang Memiliki Lahan terbatas seperti Jembatan. Loadtest Lebih Akurat Karena pile Harus Menahan Beban Hingga Belasan jam.

  • @FahrenheitSumbayak

    @FahrenheitSumbayak

    2 жыл бұрын

    @@KerjaDolan makasih bang

  • @MrGbj22
    @MrGbj22 Жыл бұрын

    Ada nomor kontak yg bisa dihubungi utk pengujian statik load ini?

Келесі