Märklin Model Railroad. Branchline Modification

Автокөліктер мен көлік құралдары

The alpine station was finally wired up to the PLC control to allow train-crossings. A cross-ower was installed instad of two points, in the lower alpine line return-loop, in order to fully automate the last remaining section of the branchline. This added the capacity of 2 more trains to the automated branch-line shadow-station. In total, there can now be 6 trains waiting, and up to 3 tains running, on the whole branchline system.

Пікірлер: 4

  • @modellbahnjp
    @modellbahnjp10 күн бұрын

    Hübsche Fahrimpressionen. Tolle Aufnahmen.

  • @hxmiesa

    @hxmiesa

    10 күн бұрын

    Vielen dank!

  • @m-gleis
    @m-gleis11 күн бұрын

    Sehr schöne und weitläufige Aufnahmen 👍🙋‍♂️ Gruß vom Michel

  • @hxmiesa

    @hxmiesa

    10 күн бұрын

    Danke! :-)

Келесі