Kamoa Copper’s Phase 1 concentrator plant reaches commercial production

Our mining and milling teams have delivered yet another strong performance, with an estimated 500,000 tonnes of ore milled to date. This video showcases the ramp up of production at the Kakula Mine, as well as the production of blister copper at the Lualaba Copper Smelter.

Пікірлер: 4

  • @francoismashala4408
    @francoismashala44082 жыл бұрын

    It's wondefull.

  • @gloirenkulu737
    @gloirenkulu7372 жыл бұрын

    I'm vert glad

  • @gundytheprophet2134
    @gundytheprophet21342 жыл бұрын

    Love seeing such things, but hopefully people of the congo are benefiting from this

  • @righteouskongo1
    @righteouskongo12 жыл бұрын

    Rwanda goes crazy when they see stuff like this.instead of being happy for a neighbour and try to work with a neighbour with all this kind of riches.They only want to send terrorist and rebels to help them steal.Anyway it will all be a game of the past coz it's changing real quick.

Келесі