Incredible Ironworking: Lifting a Half Million-Pound Bridge!

Check out these incredible ironworkers! In this video, Metropolitan Steel lifts a massive 500,000-pound bridge using two MLC300 crawler cranes. This fast-paced showcase of accelerated bridge construction highlights efficiency, innovation, and the sheer force of modern engineering. Subscribe and witness the future of construction unfold!
Featuring Ironworkers from Local 1 and 395!
www.metropolitan-steel.com

Пікірлер: 9

  • @SuperJoekoch
    @SuperJoekoch4 ай бұрын

    Nice those mlc cranes with vpc are beasts for there size

  • @oldironguy
    @oldironguy4 ай бұрын

    What size were the Manitowoc's? Beautiful counterweights on them.

  • @jimsvideos7201
    @jimsvideos72014 ай бұрын

    Nice, looks easy but the more you know the more you realize it is not.

  • @user-zv1xx3dh1o
    @user-zv1xx3dh1o2 ай бұрын

    What's that in tons.

  • @robertpalmer3166

    @robertpalmer3166

    2 ай бұрын

    Fifty million bots.

  • @cliveocnacuwenga4615
    @cliveocnacuwenga46153 ай бұрын

    WHY DOES IT NEED TO BE LIFTED? WASTE of energy and lifting capacity

  • @MetropolitanSteel

    @MetropolitanSteel

    3 ай бұрын

    Accelerated bridge construction (ABC) is actually a game-changer in the field of civil engineering! Several reasons why: 1.Safety: ABC minimizes on-site construction time, thereby reducing workers' exposure to potential hazards such as traffic accidents, falls, and other construction-related risks. Prefabricating bridge components in a controlled environment enhances quality control and reduces the likelihood of errors or accidents. 2. Efficiency: Traditional bridge construction methods often involve prolonged road closures and disruptions to traffic flow, causing inconvenience to commuters and businesses. ABC significantly reduces these disruptions by completing construction during shorter windows of reduced traffic flow. Components can be rapidly assembled on-site, allowing for quicker project completion. 3. Cost-effectiveness: Overall cost savings achieved through reduced labor, shorter project duration, and minimized traffic disruptions are substantial. ABC can also result in long-term cost savings due to the enhanced durability and quality of components. 4. Minimized Environmental Impact: By reducing construction time and traffic congestion, ABC helps minimize the environmental footprint associated with traditional construction methods. Additionally, prefabricating bridge components in a controlled environment can lead to better resource utilization and waste reduction. We appreciate your comments, and hope this method makes better sense now!

  • @robertpalmer3166

    @robertpalmer3166

    Ай бұрын

    Ohhhh please tell us how you would have done it. I can't wait!