GWR Class 802 departing London Euston for North Pole depot. Video taken 19/03/2024
Жүктеу.....
Пікірлер: 13
@miahaskurti45392 күн бұрын
I Saw Two Class 802s At Willesden Junction.
@iflymusic4862Ай бұрын
That same unit visited Waterloo just before on the same day! I posted a video of it.
@KTZ_MOP22 ай бұрын
Very rare to see a Class 801 at London Euston.
@FanOfEmirates
Ай бұрын
It’s not an 801 it’s an 802
@gabrielstravels-discoverin73682 ай бұрын
Why is it running in diesel mode?
@cmrailways
2 ай бұрын
I can only guess: - Mainly checking loading gauge issues (eg, platform height, gap etc). - Wouldn't want to accidentally bring the wires down around Euston just before rush hour. - Route to/from North Pole depot turned round at Kensington Olympia (no OHLE there).
@MikeyCondon-kv7cy
2 ай бұрын
Glimpse into furure
@cmrailways
2 ай бұрын
There were test runs to both Euston and Waterloo. Both could be used as a backup if Paddington is closed for works.
@devon896
Ай бұрын
The route it was taking is unofficial for IETs. There are no signs to tell the driver when to switch from electric to diesel.
@cmrailways
Ай бұрын
This was a test run (not a public passenger service, not a GWR driver).
@SCR_TRAINSАй бұрын
Why was the class 802 at London usten and why was it gwr
@cmrailways
Ай бұрын
I believe this was a test run for potential running into Euston, should Paddington be closed for engineering works.
@markdavies5662
Ай бұрын
Paddington will be closed over Christmas 2024 for engineering works at Old Oak Common. Apparently, a shed load of HS2 infrastructure is being installed. GWR is looking at alternative routes into London during this blockade.
Пікірлер: 13
I Saw Two Class 802s At Willesden Junction.
That same unit visited Waterloo just before on the same day! I posted a video of it.
Very rare to see a Class 801 at London Euston.
@FanOfEmirates
Ай бұрын
It’s not an 801 it’s an 802
Why is it running in diesel mode?
@cmrailways
2 ай бұрын
I can only guess: - Mainly checking loading gauge issues (eg, platform height, gap etc). - Wouldn't want to accidentally bring the wires down around Euston just before rush hour. - Route to/from North Pole depot turned round at Kensington Olympia (no OHLE there).
@MikeyCondon-kv7cy
2 ай бұрын
Glimpse into furure
@cmrailways
2 ай бұрын
There were test runs to both Euston and Waterloo. Both could be used as a backup if Paddington is closed for works.
@devon896
Ай бұрын
The route it was taking is unofficial for IETs. There are no signs to tell the driver when to switch from electric to diesel.
@cmrailways
Ай бұрын
This was a test run (not a public passenger service, not a GWR driver).
Why was the class 802 at London usten and why was it gwr
@cmrailways
Ай бұрын
I believe this was a test run for potential running into Euston, should Paddington be closed for engineering works.
@markdavies5662
Ай бұрын
Paddington will be closed over Christmas 2024 for engineering works at Old Oak Common. Apparently, a shed load of HS2 infrastructure is being installed. GWR is looking at alternative routes into London during this blockade.