at last we get round to getting the ground floor in and ready for liquid concrete

Пікірлер: 23

  • @chrismurray6184
    @chrismurray6184 Жыл бұрын

    great very informative 10min. Thanks.

  • @markhep

    @markhep

    Жыл бұрын

    Thanks Chris 👍👍

  • @richardjones3112
    @richardjones3112 Жыл бұрын

    Cracking job lads.

  • @Joe-jv5mm
    @Joe-jv5mm Жыл бұрын

    Nicely done 👍

  • @JamesKooper
    @JamesKooper Жыл бұрын

    👌

  • @aussie8114
    @aussie8114 Жыл бұрын

    Was going to ask what the foam board is for but I presume it’s an insulation to keep the floor heating more effective. Never actually seen floor heating before, some people here have it but it’s not common, we don’t get cold enough to warrant it. I presume it’s an effective and economical type of heating. I can see how once the concrete warms up it would radiate heat for an extended time, unlike heating the air which dissipates very quickly.

  • @markhep

    @markhep

    Жыл бұрын

    Yes mate there's a lot doing it over here now .it's grate in the winter when you got your feet on it feels really strange. especially when you have tiles and it's warm.only problem it there no radiators to dry your clothes on lol👍

  • @July-A7

    @July-A7

    5 ай бұрын

    ​@@markhepset a clothes rack on the tiles and hang your clothes there. They'll dry much better than on radiators . I installed ufh on ground floor by myself and it's so much getter and more economical than radiators .

  • @markhep

    @markhep

    5 ай бұрын

    @@July-A7 definitely mate 👍👍👍

  • @007issyable
    @007issyable2 ай бұрын

    Great work guys. Where are you located please?

  • @grassabrutta
    @grassabrutta5 ай бұрын

    Nice explanation and nice work. One question .... the sanitary hot/cold and the foul water piping ... in which layer are they run ? through the hardcore ? Are the clean and foul pipes separated by some conventional spacing or smtg ?

  • @markhep

    @markhep

    5 ай бұрын

    Hi mate .they got brought up through the hardcore .the foul water and the clean water were pretty close together think I gave it about 100mm apart . inspector never said anything about it when he came .👍👍

  • @umarhussain8543
    @umarhussain8543 Жыл бұрын

    Does the visqueen need to be tied into the wall under the dpc before the walls go up? Or can you lay the visqueen after the water and tape it along the walls

  • @markhep

    @markhep

    Жыл бұрын

    You can definitely lay the visqueen after mate and just put it up wall I nail it higher than the finished wall holds it up a bit 👍

  • @AF-ew9zd
    @AF-ew9zd3 ай бұрын

    can I put top membrane over the pipes and not directly over insulation boards?

  • @markhep

    @markhep

    3 ай бұрын

    Really you want it underneath.dont know if you put it on top it will probably cause the concrete not to warm up a much as it should.you set the pipes in concrete so the pipes are warming the concrete up .I mean you could do it but I don't know weather this would make the heating less efficient.if you know what I mean

  • @raulfilip9882
    @raulfilip98828 ай бұрын

    Did you not pour concrete for subfloor?

  • @markhep

    @markhep

    8 ай бұрын

    It was a massive concrete raft underneath we had to hardcore it to build it up it's about 800mm deep including raft 👍

  • @SteveAndAlexBuild
    @SteveAndAlexBuild Жыл бұрын

    Makes me laugh we have to put 2 DPMs in then put a million holes in the top one with all those clips 😂🤣🧱👍🏽

  • @markhep

    @markhep

    Жыл бұрын

    I know I said to plumber why don't you get them mats they click into he said he likes it this way .my god lol👍👍

  • @SteveAndAlexBuild

    @SteveAndAlexBuild

    Жыл бұрын

    @@markhep 🤣🤣🧱👍🏽

  • @richardjones3112

    @richardjones3112

    Жыл бұрын

    Exactly what I was thinking.💁

  • @SteveAndAlexBuild

    @SteveAndAlexBuild

    Жыл бұрын

    @@richardjones3112 🤦‍♂️😆🧱👍🏽

Келесі