Gas Pipeline Construction - Pipeline installation in to the trench in normal terrain. Pipeline lowering-in to the trench using Liebherr pipe layers. This video will demonstrate how to lower a pipeline section safely.

Пікірлер: 28

  • @williamschlenger1518
    @williamschlenger15183 жыл бұрын

    Unbelievable equipment.Back in 1960s the company I worked for ran 28 miles of 12 inch gas line with one 944Cat louder and four welders.

  • @SenorAhole
    @SenorAhole3 жыл бұрын

    Awesome job! 👌

  • @mlctv6475
    @mlctv6475 Жыл бұрын

    I miss this job...1993 Qatif Junction and Ju' aymah pipeline, Saudi Arabia.

  • @kv9765

    @kv9765

    10 ай бұрын

    Are Liebherrs that old?

  • @pawansingh-xb8tf
    @pawansingh-xb8tf3 жыл бұрын

    Gud

  • @hamishtrotter7300
    @hamishtrotter73002 жыл бұрын

    Pretty sure they caught the sides of the trench when they started. Coating damage ?

  • @mlctv6475

    @mlctv6475

    Жыл бұрын

    Easy to repair ...but before that, it would undergo holiday testing first.

  • @williamschlenger1518
    @williamschlenger15183 жыл бұрын

    Who makes that sideboom,is it German made?

  • @ericbrown375

    @ericbrown375

    2 жыл бұрын

    It is a Lee bear 64 one of the finest pieces of equipment I have ever ran yet and the John Deere 1050 K

  • @kv9765

    @kv9765

    10 ай бұрын

    @@ericbrown375not the biggest fans of the Liebherr to be honest, but I came from the open cab era so little biased. The 1050’s are the Rolls Royce for sure though

  • @saravananselvakumar5223
    @saravananselvakumar52232 жыл бұрын

    What is that green colour coated in the welded field joints

  • @mlctv6475

    @mlctv6475

    Жыл бұрын

    FBE

  • @vuraltosun6201

    @vuraltosun6201

    8 ай бұрын

    seam coating@@mlctv6475

  • @Aleksandras477
    @Aleksandras477 Жыл бұрын

    Also pipeline from Canada to USA needed!

  • @simranjitsinghhayersaab1096
    @simranjitsinghhayersaab10962 жыл бұрын

    Nice u

  • @mudassaraslam512
    @mudassaraslam5122 жыл бұрын

    How long pipeline can be lowered with side booms in single operation?

  • @user-vb6dc3yb6t

    @user-vb6dc3yb6t

    2 жыл бұрын

    Endless, they assemble on top, weld it, check it, and a mile (or whatever) down the road the pipelayers put it in.. the system can keep going on as long as you need it to be. 🙂 You do not want flanges underground, these will give you trouble.. flanges do not flex, they rust, leak, are weak points. If they need to divide the pipe to put in a shutter or pumping system, they weld a curved pipe so it comes above ground, en only above ground will be flanged because it needs maintenance. Everything undergroung should be welded. Overnight the sidebooms will just stop, and the pipe might be secured on top with a nice beefy bulldozer to make sure everything is still upright in the morning or after heavy rainfall. I have done it a couple of times with crawler cranes, which is waaaaayyyy slower and seriously tricky.. sidebooms are old fashioned equipment that is still best suited for this job.

  • @the0hatusa

    @the0hatusa

    Жыл бұрын

    can i ask sth. when are the hidrostatic tests done? after lowering? which norm (asme) state that? regards

  • @oe542

    @oe542

    Жыл бұрын

    @@the0hatusa normally the testing is done after it’s been lowered in.

  • @MattLGreer
    @MattLGreer3 жыл бұрын

    I can't be 100% sure but it looks like that pipe isn't coated?

  • @ahmedmuneer92

    @ahmedmuneer92

    2 жыл бұрын

    yes the joints need to be coated , not sure how they gonna do it inside trench

  • @utubedigitalmedia4590

    @utubedigitalmedia4590

    2 жыл бұрын

    Pipes are factory coated with 3 layer PE.

  • @utubedigitalmedia4590

    @utubedigitalmedia4590

    2 жыл бұрын

    Joints were coated outside the trench prior to lowering-in.

  • @bartbley1269
    @bartbley12697 ай бұрын

    Looks like they screwed the welders by lowering it in with not enough pipe into the bell hole . 6 feet (2 meters) past the end of the bell hole is a minimum standard

  • @kv9765
    @kv976510 ай бұрын

    That is by far one of the worst starts I’ve seen with lowering in for trying to get the pipe on the ground. Catch that swing, it should never hit the side walls like that, while it might not do much damage, that is complete amateur hour for those boom hands .

  • @donpeifer696

    @donpeifer696

    9 ай бұрын

    That was pitiful watching that pipe swinging hitting the edges of the ditch. The GREEN TEAM?

  • @nolanjohnston7050
    @nolanjohnston70508 ай бұрын

    Amateur hour!

Келесі