Efficiency Production Slide Rail System - 4-Sided System INSTALLED
Efficiency Production's premier Slide Rail System is easier to install and remove than any of its competitors. Every Slide Rail configuration starts with the ASSEMBLY of a 4-Sided system.
Пікірлер: 4
Good job. Familiar work for me.
follow up vid?...no dewatering?
How about they show the extraction and the fucking MAN shackles and cable you have lug around.
OSHA would have a lot to say about the fall hazard