Delivering High Speed Two (HS2) with BIM

“We’ve decided to bet the shop on building information modelling (BIM)” - Join Professor Andrew McNaughton, Technical Director of High Speed Two (HS2), for a look at how BIM is shaping the design, delivery, operation and maintenance of Britain’s latest high speed railway.
Speaking at Digital Construction Week 2015 in London, United Kingdom (UK), Andrew first looks at the context for High Speed Two, before explaining how BIM is being used as the foundation for its development.
He uses a powerful illustration to indicate the project’s approach, showing the old way of doing things and the virtual approach that will be taken. “It’s easy to do things the way we know how, that’s why somebody drew in the devil” he explains. “We want to build, operate and maintain a virtual railway. And only when we have proven that in a virtual environment will we go anywhere near a shovel”.
At present the High Speed Two team are developing the BIM platform upon which the data for the new railway will be hosted. Every aspect of High Speed Two’s operation and maintenance is being built upon one common data environment.
To prove that the team have ‘bet the shop on it’ (in Andrew’s words), that platform will host the safety critical control systems, train control, fleet management, human resource management, scheduling and consumer data. “We have this concept of total reliance on our data. It’s one integrated system. We’re building the BIM platform upon which every aspect of High Speed Two will operate” he explains.
Far from creating a barrier to entry, they have been carefully considering how they can help others work with them in a BIM environment during the delivery and operational phases. “That’s been happening in the early days with public consultations” Andrew explains. “You can’t show people something that isn’t right. Everything we do we have to evidence, and that evidence is built upon what is in our BIM model”.
“The visualisation element is incredibly powerful” he adds. “We’ve been able to show people exactly how this will look from their bedroom window. We can personalise it which makes a fundamental difference when talking to those that we will affect with this railway”.
Closing his presentation, Andrew highlights that the core focus for High Speed Two is on people and their experience as passengers. “We want this to be a complement of human beings and IT, human beings and BIM” he explains.
“BIM enables us to prove that what we are proposing is reliable, because if it’s not reliable, it’s not worth building. That’s critical because what we do now, will be judged by people not yet born”
Presented by Professor Andrew McNaughton, Technical Director, High Speed Two Limited.
With thanks to High Speed Two Limited. Imagery used with permission of High Speed Two Limited. Aerial footage used with permission of High Speed Two Limited and Arup Group Limited. The aerial footage shown represents a snapshot in time and reflects the land take as shown in the deposited Hybrid Bill (November 2013). For more on High Speed Two visit: www.gov.uk/government/organis...
Filmed at Digital Construction Week 2015 in London, UK.
For more BIM videos subscribe now - ow.ly/GxW7y
The B1M is the definitive video resource for building information modelling (BIM). We want to inspire a million people through our videos to help mobilise BIM adoption around the world.
View this video and more at www.TheB1M.com
Follow us on Twitter - / theb1m
Like us on Facebook - / theb1m
Follow us on Linkedin - / the-. .
B1M pictures on - / theb1m
We welcome you sharing our content to inspire others, but please be nice and play by our rules: www.theb1m.com/guidelines-for-...
Our content may only be embedded onto third party websites by arrangement. We have established partnerships with domains to share our content and help it reach a wider audience. If you are interested in partnering with us please contact Enquiries@TheB1M.com.
Ripping and/or editing this video is illegal and will result in legal action.
© 2015 The B1M Limited

Пікірлер: 17

  • @iwasborn8470
    @iwasborn84703 жыл бұрын

    e

  • @ianscott6036
    @ianscott60364 жыл бұрын

    Blk

  • @ankitpatel4162
    @ankitpatel41626 жыл бұрын

    and then brexit happened......

  • @factorylad5071
    @factorylad50713 жыл бұрын

    Never heard such a load of tripe up till now.

  • @peterallison4464
    @peterallison44644 жыл бұрын

    Infrastructure particularly roads throughout the UK failing, flood defences not build after five years, increased climatic impact on populated areas, housing shortages, Hospitals under funded, on and on and the UK Governments want to build a over expensive gravy train network how dumb can you get. It will be the road (rail) to knowhere. UK parliament not fit for purpose and not representing the people. America the largest most successful economy in the history of the planet (so far)has no high speed rail network they just make the right decisions.

  • @peggymitchell5452

    @peggymitchell5452

    4 жыл бұрын

    America are building one of their own...get with the times!

  • @peterallison4464

    @peterallison4464

    4 жыл бұрын

    Planned: Many projects are planned in fact the majority are planned never get built, stating something is planned is in most cases political expediency, people are really gullible politicians know this. Get with the real times.

  • @peggymitchell5452

    @peggymitchell5452

    4 жыл бұрын

    www.globalrailwayreview.com/news/97173/funding-legislation-california-high-speed-rail/ - nuff said

  • @nicolasblume1046

    @nicolasblume1046

    4 жыл бұрын

    The USA have a good economy DESPITE not having highspeed rail, not because of it. Saying that not building it is always the right decision is just nonsense.

  • @peterallison4464

    @peterallison4464

    4 жыл бұрын

    Nonsense: your just hoping.

  • @petervividus3416
    @petervividus34164 жыл бұрын

    Total waste of cash, whos to say in a 100 years there not teleportation where in like star trek. Also with such things roads cars trains and plains are worthless. Once again big government doing wasteful things, probably be better if artifical super intelligence runs the show. Get people out of government.!

  • @elliotlyons2810

    @elliotlyons2810

    3 жыл бұрын

    ok

  • @jermainetrainallen6416

    @jermainetrainallen6416

    3 жыл бұрын

    Erm what are you on about??? Teleportation??? Are you joking??? HS2 is being built to release capacity on the existing rail network for more local and freight services which cuts carbon emissions by taking HGV's off the roads, cut domestic flights, encourage modal shift to rail from cars and stimulate economic growth etc.

  • @Josh-oj9mm

    @Josh-oj9mm

    2 жыл бұрын

    Teleportation is impossible at our current level of science Heisenberg uncertainty principle