CP TECHNOLOGY The prefabrication plant for the biggest European TMB

Ғылым және технология

CP Technology, specialists in mould and carousel systems, is proud to invite you to visit the “state of the art” Tunnel Segment Prefabrication Plant designed for the Santa Lucia Tunnel Project. The work is part of the widening of the motorway network between Milan and Naples. The tunnel, with an excavated diameter of 15.87 meters, is using the largest TBM in Europe. CP Technology, one of the only companies in the market with the capability to deliver a turnkey prefabrication plant, has been selected to supply the entire segment prefabrication plant, by Maccaferri Tunneling; a division of Maccaferri, specialized in solutions for the Tunnelling Industry.
In only 6 months, CP Technology has designed and manufactured the steel framed building, the lifting and handling equipment, and most significantly the carousel plant, thereby relieving the client of the management and coordination of multiple suppliers. Thirty years of experience in prefabrication, combined with innovation in design and manufacturing have made it possible to deliver an optimized production process: more efficient, safer and of course, cost effective.
CP technology the right partner, a turn-key solution provider capable of handling your prefabrication plant.

Пікірлер: 5

  • @user-gp8kv8br1h
    @user-gp8kv8br1h2 жыл бұрын

    Clear message, clear structure, easy to understand, thank you

  • @basimalbayati660
    @basimalbayati6603 жыл бұрын

    great work

  • @christopheroverbeck3662
    @christopheroverbeck36622 жыл бұрын

    Can anyone explain why segments for a circular tunnel need reinforcement? I thought that steel is for tensile forces, but a circular tunnel should only be in compression right?

  • @xuanphonghoang9869
    @xuanphonghoang98692 жыл бұрын

    how did you do it can you share with me , thank you

  • @liamberesford2872
    @liamberesford28722 жыл бұрын

    くさんありますありがとうございます」、

Келесі