Contessa 26 Refit ep.2 - Bulkheads, Mast Beam and Toilet

Documenting the refit of a 1975 Contessa 26 - J.J. Taylor build. Not an instructional video; recording for my own reference.
Projects completed in this episode:
o Varnished and installed all interior teak bulkheads and wet locker, trim.
o Laminated a mast beam from oak strips, varnished and installed.
o Replaced head/toilet.
o Prepared bilge for sanitation plumbing.

Пікірлер: 9

  • @kirenireves
    @kirenireves4 жыл бұрын

    Came here from Alan's channel on SV Wave Rover. I'm looking forward to your adventure.

  • @mboyer68
    @mboyer683 жыл бұрын

    Wow! Your bulkheads do look like fine furniture! Excellent work!

  • @elliowb2
    @elliowb24 жыл бұрын

    You're really doing a great job on your refit. Very shipshape. I'm enjoying your videos and updates. Fair seas.

  • @garycoker27
    @garycoker274 жыл бұрын

    Great job on a great boat

  • @kevinschyf3795
    @kevinschyf37954 жыл бұрын

    Love the bulk heads!

  • @navegandolamonthyhuelva7717
    @navegandolamonthyhuelva77174 жыл бұрын

    Amazing job. I'm refitting a Contessa 26, too. I just suscripbed to your channel.

  • @tomasbouda4419
    @tomasbouda44194 жыл бұрын

    I subscribed ;)

  • @PaulDowning
    @PaulDowning4 жыл бұрын

    Audio needs work, but looking good.

  • @EpoxyAndButylTape

    @EpoxyAndButylTape

    4 жыл бұрын

    Working on it