Company HUTNÍ MONTÁŽE - Old Bridge in Bratislava

Ғылым және технология

📌 Subject: Dismantling of the original bridge and installation of the steel structure of the bridge
📌 Implementation: 11/2014 - 11/2015
📌 TECHNICAL PARAMETERS
✔️ Total length of the bridge structure: 462 m,
✔️ Width: 22.1 m (max. 33.1 m),
✔️ Height of the structure: 11.3 m,
✔️ Total weight of the structure: 5650 tons.
✏️ If you have any questions, do not hesitate to contact me.
➡ E-mail: michal.vorynka@hutni-montaze.cz
➡ Mobile: +420 702205466
➡ WITKOWITZ, a.s.
➡ MICHAL VORYNKA
#engineering #manufacturing #design #equipment ​#technology #bucketwheel #manufacturing #transport

Пікірлер

    Келесі