Company HUTNÍ MONTÁŽE - Bridge in Blansko

Ғылым және технология

📌 The bridge is over the railway and the river Svitavka. The bridge is partially concreted before being extended (the steel structure of the bridge weighs approx. 500 tons, concrete another 500 tons), approx. 1000 tons was extended. The extension speed can be a maximum of 10m per hour.
📌 PARAMETERS
📌 Steel structure 500 tons
📌 Concrete 500 tons
📌 Length of steel structure 90 m
🏭 Made in #CzechRepublic ⚒ ⚒ ⚒ ⚒ ⚒
✏️ If you have any questions, do not hesitate to contact me.
➡ E-mail: michal.vorynka@hutni-montaze.cz or michal.vorynka@witkowitz.cz Mobile: +420 702205466
#engineering #manufacturing #design #bucketwheelexcavator #equipment ​#technology #sidescraper #manufacturing

Пікірлер

    Келесі