builders post tension.mpg

This video provides information about Builders Post Tension- Houston and the process involved using a post tension reinforced foundation system. For additional information please contact our office at 281-873-9500.

Пікірлер: 17

  • @prabhakarkewale5299
    @prabhakarkewale52994 жыл бұрын

    A good video for knowledge. Thanks.

  • @miket7071
    @miket70719 жыл бұрын

    Thank you for the video!

  • @Whisky_Four-Three
    @Whisky_Four-Three11 жыл бұрын

    great vid thanks for the upload

  • @rockinpip4212
    @rockinpip42129 жыл бұрын

    nice representation of a guy standing over the jack while pulling the cable he will only do that once if the cable breaks lol

  • @GhulamMurtaza-fx8bi

    @GhulamMurtaza-fx8bi

    8 жыл бұрын

    first of all the stressing work need minimum two workers ,one for fixing the jack other for operating the hydraulic pump .. this is guy is doing great job he is not standing behind the jack because when ever strand breaks it comes to backwards, not upwards. he is totally out of danger bro....

  • @rockinpip4212

    @rockinpip4212

    8 жыл бұрын

    Ghulam Murtaza hey moron i used to stress cables ive seen them break dont tell me what you think and 1 guy can stress cables alone dipshit

  • @gallardo360

    @gallardo360

    3 жыл бұрын

    it takes two democrats or 1 republican, just sayin

  • @jsstyger5492
    @jsstyger54928 жыл бұрын

    Those SOBs are pouring an 8 inch slump at 9:25!

  • @jerrygelder8373
    @jerrygelder83739 жыл бұрын

    Umm...wow.. I will sure not be moving to Houston if this is how it is done down there.

  • @lucasfarias1929
    @lucasfarias19298 жыл бұрын

    what dimension that tendon? 15,2mm or 12,7mm? what the end pressure? Qual o diâmetro dessa cordoalha? Qual a pressão final da bomba?

  • @bpt8831

    @bpt8831

    2 жыл бұрын

    1/2" cable

  • @buildingbuildercip8292
    @buildingbuildercip82927 жыл бұрын

    Why did they wait so long to stress? Always wait about 48 to 72 hours not days.

  • @bpt8831

    @bpt8831

    2 жыл бұрын

    Pre-Stress can be next day. Normal full stress is typically 7 days out. THNX

  • @buildingbuildercip8292

    @buildingbuildercip8292

    2 жыл бұрын

    @@bpt8831 Here in California... stressing depends on the percentage of strength the concrete has reached. Usually 70% of 5000psi. When we pour a floor a week...we bump up the psi strength so that we can stress the next day. Once the rod buster is done stressing the first time, he is done. At least in California.

  • @bpt8831

    @bpt8831

    2 жыл бұрын

    @@buildingbuildercip8292 This is on a slab on grade Home foundation. Not HiRise. But it’s still based on strength of concrete as you are stating. 2,500 to 3,500 psi is the strength used on most residential SOG home foundations here in Texas. 👍🏻