Bridge Strike Tutorial - Lorries Can't Limbo.

To help HGV drivers from driving into railway bridges

Пікірлер: 13

  • @phil7301
    @phil73014 ай бұрын

    Asda, keeping prices low, and keeping their trucks even lower

  • @thewidowmaker4037
    @thewidowmaker40379 күн бұрын

    And that why you always go under a curved bridge in the middle.

  • @Tiswhattitis
    @Tiswhattitis3 ай бұрын

    This is always a lorry drivers nightmare!! And to be honest, it shouldn't even be a thing!! Things like a low bridge by an industrial estate is just crazy! There's no reason for it! You can't raise a railway but you can lower a road! If you put proper drainage in to stop water pooling up, there's no excuse for a low bridge. My truck is 14"6 and there have been times my truck nav has tried to direct me under a 10'9 bridge despite me putting all the measurements into the nav! Luckily I've never hit a bridge yet, but it's an absolute pain in the arse trying to turn an articulated 44t truck around in a busy little street!!

  • @helenlloyd6564
    @helenlloyd65644 ай бұрын

    With supermarket deliveries you are often given a risk assessment pamphlet. Giving info of preferred route and risk and observations needed to adhere to at the destination. He either forgot he was pulling a double decker which sometimes is 16ft 2ins, or a newly qualified driver not sure or aware of trailer heights. Though he should be aware of his height. I doubt he is still working for ASDA.

  • @DAVID-bv2gv
    @DAVID-bv2gv3 ай бұрын

    fair play to the driver he can back a wagon up

  • @petemullen842

    @petemullen842

    3 ай бұрын

    It’s a pity the same thing can’t be said about driving one forward

  • @BethzeidaJohnson
    @BethzeidaJohnson3 ай бұрын

    Are lorries getting higher or bridges getting lower?

  • @petemullen842
    @petemullen8423 ай бұрын

    Should’ve gone to Specsavers👀🤣

  • @echothehusky
    @echothehusky3 ай бұрын

    If the driver had driven faster he would have got out the other side.

  • @tommycoughlan4104
    @tommycoughlan41044 ай бұрын

    There could have being road work done that would heighten the ground

  • @davidjones5367

    @davidjones5367

    4 ай бұрын

    Whilst it can and does happen, I had a driver on a CPC Course that I ran that, that had happened to, but not in this instance.Bridge height 14ft, Trailer 16ft 2in, that would have been an extraordinary amount of Tarmac laid.

  • @andrewcassidy7795

    @andrewcassidy7795

    4 ай бұрын

    Well you've never seen Gateshead council put a road down then.

  • @user-oq5bu4lk5b
    @user-oq5bu4lk5b3 ай бұрын

    Transport management are at fault, they have the responsibility on behalf of the company's they work for to ensure the drivers are suitably competent and at the very least have some understanding of the current high way code