2.18 GENERAL REQUIREMENTS FOR BITUMINOUS PAVEMENT LAYERS (cl. 501 of MORT&H)
2.18.3 Mixing
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity and capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates. Appropriate mixing temperatures are given in Table 500-2 of these Specifications, the difference in temperature between the binder and aggregate shall at no time exceed 14°C. In order to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be calibrated from time to time. The essential features of the hot mix plants are given in Annex A of IRC: 27.
Mixing, Laying and Rolling Temperatures for Bituminous Mixes (Degree Celcius) (Table 500-2 of MORT&H)
Note: Rolling must be completed before the mat cools to these minimum temperatures.
If a continuous type mixing plant is used, the Contractor must demonstrate by laboratory analysis that the cold feed combined grading is within the grading limits specified for that bituminous bound material. In the case of a designed job mix, the bitumen and filler content shall be derived using this combined grading.
2.18.4 Transporting
Bituminous materials shall be transported in clean insulated and covered vehicles. An asphalt release agent, such as soap or lime water, may be applied to the interior of the vehicle to prevent sticking and to facilitate discharge of the material.
2.18.5 Laying
2.18.5.2 Cleaning of Surface
The surface on which the bituminous work is to be laid shall be cleaned of all loose and extraneous matter by means of a mechanical broom and air jet. The equipment for applying a high pressure air jet from a compressor to remove dust or loose matter shall be available full time at the site.
2.18.5.3 Spreading
Prior to spreading the mix, the base shall be prepared by carrying out the required operations as per Clause 501.8 depending upon the site conditions. Except in areas where paver cannot get access, bituminous materials shall be spread, levelled and tamped by an approved self-propelled paving machine equipped with an electronic sensing device. The essential features of the paver finisher shall conform to Annex A of IRC: 27. As soon as possible after arrival at site, the materials shall be supplied continuously to the paver and laid without delay. The rate of delivery of material to the paver shall be regulated to enable the paver to operate continuously. The travel rate of the paver, and its method of operations, shall be adjusted to ensure an even and uniform flow of bituminous material across the screed, free from dragging, tearing and segregation of
the material. In areas with restricted space (such as confined space, foot ways, of irregular shape and varying thickness, approaches to expansion joints, etc.) where paver cannot be used, the material shall be spread, raked and levelled with suitable hand tools by trained staff.
2.18.6 Compaction
Compaction of bituminous materials shall commence as soon as possible after laying. Compaction shall be substantially completed before the temperature falls below the minimum rolling temperatures stated in the relevant part of these Specifications. Rolling of the longitudinal joints shall be done immediately behind the paving operation. After this, rolling shall commence at the edges and progress towards the centre longitudinally except that on super-elevated and unidirectionally cambered portions, it shall progress from the lower to the upper edge parallel to the centre line of the pavement. Rolling shall continue until all roller marks have been removed from the surface. All deficiencies in the surface after laying shall be made good by the attendants behind the paver, before initial rolling is commenced. The initial or breakdown rolling shall be done with 8-10 tonne static weight smooth-wheel rollers. The intermediate rolling shall be done with 8-10 tonne static weight or vibratory roller or with a pneumatic tyre roller of 12 to 15 tonne weight, with a tyre pressure
of at least 0.56 MPa. The Contractor shall demonstrate the efficiency of the equipment proposed to be used by carrying compaction trials. The procedure for site trials shall be submitted to the Engineer for approval. The finish rolling shall be done with 6 to 8 tonne smooth wheel tandem rollers. Rolling shall continue until the specified compaction is achieved.
Rollers should move at a speed of not more than 5 km per hour. The roller shall not be permitted to stand on pavement which has not been fully compacted, and necessary precautions shall be taken to prevent dropping of oil, grease, petrol/ diesel or other foreign matter on the pavement either when the rollers are operating or standing.

Пікірлер: 12

  • @SunnyJasper53
    @SunnyJasper53Ай бұрын

    Great ❤

  • @gambeersagar6838
    @gambeersagar683811 ай бұрын

    Operations are smart

  • @jayworld001
    @jayworld0014 жыл бұрын

    Helpful video..

  • @ssfmohamad2941
    @ssfmohamad29417 ай бұрын

    what is tank 1 and tank 2 for what?

  • @Riyasbook
    @Riyasbook3 жыл бұрын

    Super

  • @JayantaMandal123

    @JayantaMandal123

    3 жыл бұрын

    Thanks

  • @P.K.Tech.

    @P.K.Tech.

    Жыл бұрын

    @@JayantaMandal123 dmpr driver ki salary kitni h plij reply

  • @ajitsakale5364
    @ajitsakale53643 жыл бұрын

    कोणत्या साइज चे मटेरियल घेता एग्रीगेट

  • @eraamir7774
    @eraamir77743 жыл бұрын

    Civil engineer ka kya kaam hota hai mecadam plant mai ...plxx tell me......civil engineer ko mecadam plant mai kam karna chahee ya nhi ....plxxx tell me

  • @JayantaMandal123

    @JayantaMandal123

    3 жыл бұрын

    Material proportion thik thak ja raha hain ki nahi wo dekna parta hain... bitumen quantity check karna parta hain...

  • @eraamir7774

    @eraamir7774

    3 жыл бұрын

    @@JayantaMandal123 thankew bro....

Келесі