In this video, detailed discussion of #Alumino Thermic #AT Welding of #Rail Joints (Full Procedure) as per #RDSO #AT Welding #Manual has been done with its significance, which will be useful for aspirants of UPSC ESE/GATE/PSU's/SSC-JE /State PSC JE/AE exams and #P.way Engineer on Site.
Following content has been discussed in this video:-
#Alumino Thermic #AT Welding of #Rail Joints (Full Procedure) as per #RDSO #AT Welding #Manual.
Stepwise Procedure of #AT #Welding of Rail Joints is as follows:-
1. Elimination of Fish Bolts & atleast 5 sleepers loosening from both ends i. e. 250 mm clear working space on either side must be there.
2. Alignment of 2 rails using 1 m straight edge.
Note:- a) Lateral Alignment = 0.5 mm when checked using 1 m straight edge.
b) Vertical Alignment = 3 mm to 4 mm for 72 UTS rails & 2 mm to 2.4 mm for high UTS rails.
3. Gap between rails shall be from 50 mm to 70 mm with 1 mm tolerance.
4. Fixing of Moulds followed by Carbon Dioxide Gas.
5. Preheating using High Silica Sand Mould & Bentonite clay (Carbon Dioxide dried).
Note:- a) Preheating is done by Compressed air fuel mixture.
b) Rails shall be free from corrosion & excess wear.
c) Preheating using blower must be done for 4 to 4.5 minutes for maintaining temperature of 580°c to 620°c.
6. Sparkler shall be ignited & inserted in portion ( Oxides of metals) at centre top to start the reaction. After reaction subsides, about 3 seconds shall be allowed for separation of slag from metal.
7. Post cooling should be atleast for 20 minutes.
8. After Cooling, cutting of extra part of cast iron mould within 3 minutes after opening of boxes using trimmer.
Note:- a) Opening of boxes shall be within 3 minutes from cast iron moulds.
9. Grinding of Joint using grinding machine.
10. Tolerance checking on finished heads:-
a) Vertical Alignment = 1.0 mm, 0 mm measured at end of 1 m straight edge.
b) lateral alignment = 0.3 mm measured at centre of 1 m straight edge.
c) Finished top surface = 0.4 mm, 0 mm measured at centre of 10 cm straight edge.
d) Head Finished on sides = 0.3 mm over gauge side of rail head measured at centre of 10 cm straight edge.
11. USFD testing of Joints for DFWO & DFWR identification.
Note:-
1. Gap between two rails should be within 25 mm before welding.
2. Total cost of one AT weld is approx.
Rs.7000/-.
3. UTS stands for Ultimate Tensile strength in Mpa.
Subscribe my you tube channel ‪@CivilEngg.ByYogeshKaushik‬ for further updates / @civilengg.byyogeshkau...
Video Link of Rail Cutting, Drilling & Chamfering of Bolt Holes:-
• DRILLING & CHAMFERING ...
Video Link of USFD testing of AT welded Rail Joints:-
• USFD TESTING of AT WEL...
Video Link of Short Welded Rails & Long Welded Rails:-
• SHORT WELDED RAILS (SW...
PDF Link of Manual for fusion welding of rails by the Alumino Thermic Process:-
drive.google.com/file/d/13aCl...

Пікірлер: 19

  • @subodhminj7709
    @subodhminj7709 Жыл бұрын

    Very good ☺️😊😂 this video 👍📸

  • @subodhminj7709
    @subodhminj7709 Жыл бұрын

    Very very thank you sir

  • @situdhankhar7323
    @situdhankhar73233 жыл бұрын

    Ye class bhot important thi mere liye sir ap ka bhot bhot bhot sukriya

  • @mohitkaushikpauli2847
    @mohitkaushikpauli28473 жыл бұрын

    Great job sir ji

  • @muralialigi9391
    @muralialigi93912 жыл бұрын

    Super explanation sir

  • @situdhankhar7323
    @situdhankhar73233 жыл бұрын

    Good sir

  • @SanjeetSingh-fh9pf
    @SanjeetSingh-fh9pf3 жыл бұрын

    Very nice sir...

  • @binodchoudhary7906
    @binodchoudhary79062 жыл бұрын

    Very nice video sir. Please provide objective question with answers for ldce je p. way.

  • @KrishnaKumar-fr3th
    @KrishnaKumar-fr3th3 жыл бұрын

    Holaf

  • @chandanjha6712
    @chandanjha6712 Жыл бұрын

    Sir,ye Sara process 70-75 min mai complete ho jata hai...pre-heating temp.650-850 degree Celsius...pre heating time 10-12 min, traffic allow after 30 min.....video mai kuch correction ki jarurat hai...

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    Жыл бұрын

    Ok

  • @farukhrehman6137
    @farukhrehman61372 жыл бұрын

    Ak joint par kitna petroleum lagti hy

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    2 жыл бұрын

    Refer AT welding manual please..

  • @farukhrehman6137
    @farukhrehman61372 жыл бұрын

    Sir je ak joint or kitni cast Ati hy pr dollar

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    2 жыл бұрын

    Approx 7000/- per joint

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    2 жыл бұрын

    Video ke description box me sb likha hua h

  • @livid5910
    @livid59102 жыл бұрын

    At weld par joggled fish plate kab bandhte hai

  • @CivilEngg.ByYogeshKaushik

    @CivilEngg.ByYogeshKaushik

    2 жыл бұрын

    When we have to use defective AT weld only for some time temporarily i. e. DFWO Ki category me

  • @balawantsingh1479
    @balawantsingh14793 жыл бұрын

    Sir aap Apna mobile no. Send kriye plzz

Келесі